Analisis Penjadwalan Proyek Pembangunan dengan Menggunakan Metode CPM Dan PERT

Rama Engineering is one of the companies that is moving in the field of construction that is currently working on the construction project of the University of Pamulang campus 3 Witana Harja. In the implementation of such construction projects there is usually a deadline every week, but the actual delay from the planning of 9 months to 11 months requires the calculation of the project scheduling. Project scheduling is one of the planning elements that can provide information about the schedule of plans and the progress of ongoing projects. To find out the optimal time of the project is done analysis using the CPM method and for the most possible duration in the acceleration of the building construction project is analyzed using the PERT method. The results of the analysis using the CPM method showed a 3-week acceleration where the initial project duration of 35 weeks was 32 weeks with a 3% accelerated presentation score with a critical path A – B – C – D – E – R – S – U, whereas the analysis with the PERT method saw a 1-week 6-day accelerations where the project initial duration for 35 weeks became 33.17 weeks with an accelerating presentation score of 1.87% with a Critical Path A - B - C - D - E - R - S - U. In conclusion, in order to minimize the completion time of the project as a whole, a combination of similar activities is carried out. . Keywords: CPM, Project Management, PERT

Institutions

Publication Details

Journal
JITMI (Jurnal Ilmiah Teknik dan Manajemen Industri)
Published
2024-10-31
DOI
https://doi.org/10.32493/jitmi.v7i2.y2024.p75-84
Primary Topic
Bacterial Genetics and Biotechnology
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Analisis Penjadwalan Proyek Pembangunan dengan Menggunakan Metode CPM Dan PERT

JITMI (Jurnal Ilmiah Teknik dan Manajemen Industri)
Bacterial Genetics and Biotechnology
article

Analisis Penjadwalan Proyek Pembangunan dengan Menggunakan Metode CPM Dan PERT

article en

Abstract

Rama Engineering is one of the companies that is moving in the field of construction that is currently working on the construction project of the University of Pamulang campus 3 Witana Harja. In the implementation of such construction projects there is usually a deadline every week, but the actual delay from the planning of 9 months to 11 months requires the calculation of the project scheduling. Project scheduling is one of the planning elements that can provide information about the schedule of plans and the progress of ongoing projects. To find out the optimal time of the project is done analysis using the CPM method and for the most possible duration in the acceleration of the building construction project is analyzed using the PERT method. The results of the analysis using the CPM method showed a 3-week acceleration where the initial project duration of 35 weeks was 32 weeks with a 3% accelerated presentation score with a critical path A – B – C – D – E – R – S – U, whereas the analysis with the PERT method saw a 1-week 6-day accelerations where the project initial duration for 35 weeks became 33.17 weeks with an accelerating presentation score of 1.87% with a Critical Path A - B - C - D - E - R - S - U. In conclusion, in order to minimize the completion time of the project as a whole, a combination of similar activities is carried out. . Keywords: CPM, Project Management, PERT

JITMI (Jurnal Ilmiah Teknik dan Manajemen Industri)Vol. 7(2)
Universitas Pamulang (ID)
Industry, innovation and infrastructure
Openalex Percentile: Top 33%
Bacterial Genetics and Biotechnology
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.