Research on the Application of Intelligent Scheduling for Prefabricated Beam Production Based on Dynamic Plan Driving

As the level of bridge industrialization continues to improve, the scale of prefabricated beam factory construction expands and the production cycle accelerates, which poses greater challenges to planning and scheduling management in actual production processes. Aiming at the problems of time-consuming manual scheduling, non-compact scheduling, and non-timely dynamic adjustment in traditional beam yard production, this paper establishes a dynamic plan-driven intelligent scheduling model for precast beam production, realizing the generation of cycle scheduling plans based on predetermined cycle tasks and dynamic schedule updates during production processes, to provide optimal solutions for prefabricated beam factories' production. It achieves the generation of cycle scheduling plans based on predetermined cycle tasks and dynamic scheduling updates during the process, providing fast, accurate, and reasonable process-level scheduling for precast beam production.

Institutions

Publication Details

Published
2025-06-20
DOI
https://doi.org/10.1109/seai65851.2025.11108901
Primary Topic
Geochemistry and Geologic Mapping
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Research on the Application of Intelligent Scheduling for Prefabricated Beam Production Based on Dynamic Plan Driving

Geochemistry and Geologic Mapping
article

Research on the Application of Intelligent Scheduling for Prefabricated Beam Production Based on Dynamic Plan Driving

article en

Abstract

As the level of bridge industrialization continues to improve, the scale of prefabricated beam factory construction expands and the production cycle accelerates, which poses greater challenges to planning and scheduling management in actual production processes. Aiming at the problems of time-consuming manual scheduling, non-compact scheduling, and non-timely dynamic adjustment in traditional beam yard production, this paper establishes a dynamic plan-driven intelligent scheduling model for precast beam production, realizing the generation of cycle scheduling plans based on predetermined cycle tasks and dynamic schedule updates during production processes, to provide optimal solutions for prefabricated beam factories' production. It achieves the generation of cycle scheduling plans based on predetermined cycle tasks and dynamic scheduling updates during the process, providing fast, accurate, and reasonable process-level scheduling for precast beam production.

CCCC Wuhan Harbour Engineering Design and Research (China) (CN)
Affordable and clean energy
Openalex Percentile: Top 25%
Geochemistry and Geologic Mapping
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.