Time and Method Study Analysis to Improve Productivity of Shirt Manufacturing for Case of JP Garment

Abstract: Productivity is crucial for global market competitiveness, requiring higher labor and machine efficiency. In the case company, the line efficiency of the shirt sewing line is below the target, and this was due to the unbalanced workload distribution and inappropriate working methods. This paper focused on integrating line balancing techniques and method study to improve the efficiency of shirt sewing lines. Method analysis was applied to bottleneck operations to minimize non-value-adding activities performed by operators. Cycle time for all operations was computed after performing adequacy and uniformity tests for time study data. Next, the researcher performed method analysis on four operations, which have a bottlenecking behavior using video analysis. A flow process chart and precedence diagram were developed. A flow process chart was used to analyze which event is value-adding, or non-value-adding. The stopwatch time for sleeve attaching operation shows 62 seconds but the Garment Sewing Data is 46 seconds and the delay time is 16 seconds. This can be improved by revising the working method and this study achieved savings of 13 seconds by eliminating non-value-adding activities. The second sewing operation analyzed was an armhole outline, and savings of 14 seconds were gained. The third operation that was analyzed was cuff attach and a saving of 14 seconds was gained and the last was bottom hem outline to gain a saving of 12 seconds.

Publication Details

Published
2024-11-10
DOI
https://doi.org/10.82127/30q8sg39
Primary Topic
Nail Diseases and Treatments
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Time and Method Study Analysis to Improve Productivity of Shirt Manufacturing for Case of JP Garment

Nail Diseases and Treatments
article

Time and Method Study Analysis to Improve Productivity of Shirt Manufacturing for Case of JP Garment

article en

Abstract

Abstract: Productivity is crucial for global market competitiveness, requiring higher labor and machine efficiency. In the case company, the line efficiency of the shirt sewing line is below the target, and this was due to the unbalanced workload distribution and inappropriate working methods. This paper focused on integrating line balancing techniques and method study to improve the efficiency of shirt sewing lines. Method analysis was applied to bottleneck operations to minimize non-value-adding activities performed by operators. Cycle time for all operations was computed after performing adequacy and uniformity tests for time study data. Next, the researcher performed method analysis on four operations, which have a bottlenecking behavior using video analysis. A flow process chart and precedence diagram were developed. A flow process chart was used to analyze which event is value-adding, or non-value-adding. The stopwatch time for sleeve attaching operation shows 62 seconds but the Garment Sewing Data is 46 seconds and the delay time is 16 seconds. This can be improved by revising the working method and this study achieved savings of 13 seconds by eliminating non-value-adding activities. The second sewing operation analyzed was an armhole outline, and savings of 14 seconds were gained. The third operation that was analyzed was cuff attach and a saving of 14 seconds was gained and the last was bottom hem outline to gain a saving of 12 seconds.

Decent work and economic growth
Openalex Percentile: Top 43%
Nail Diseases and Treatments
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.