A stochastic optimization framework for AI-driven commissioning processes in data centers: Enhancing lifecycle efficiency and cost reduction

This study introduces a new AI-driven framework for commissioning hyperscale data centers, replacing traditional checklist methods with a more efficient, autonomous process. By integrating Bayesian optimization with a real-time digital twin, the system dynamically plans and adjusts performance tests, aiming to maximize efficiency while minimizing cost and risk. The approach uses Gaussian-process models to update its understanding as data is collected, enabling smarter decisions with less testing. Results show significant benefits over conventional methods, including 15–25% faster commissioning, lower upfront costs, and 8–12% energy savings over the data center facility’s lifetime. The proposed framework therefore offers a scalable, AI-driven pathway to accelerate deployment, cut costs, and embed continuous optimization capabilities from day one in modern data-center infrastructure.

Institutions

Publication Details

Journal
Zenodo (CERN European Organization for Nuclear Research)
Published
2025-07-30
DOI
https://doi.org/10.5281/zenodo.17224857
Primary Topic
Education, Psychology, and Social Research
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

A stochastic optimization framework for AI-driven commissioning processes in data centers: Enhancing lifecycle efficiency and cost reduction

Zenodo (CERN European Organization for Nuclear Research)
Education, Psychology, and Social Research
article

A stochastic optimization framework for AI-driven commissioning processes in data centers: Enhancing lifecycle efficiency and cost reduction

article en

Abstract

This study introduces a new AI-driven framework for commissioning hyperscale data centers, replacing traditional checklist methods with a more efficient, autonomous process. By integrating Bayesian optimization with a real-time digital twin, the system dynamically plans and adjusts performance tests, aiming to maximize efficiency while minimizing cost and risk. The approach uses Gaussian-process models to update its understanding as data is collected, enabling smarter decisions with less testing. Results show significant benefits over conventional methods, including 15–25% faster commissioning, lower upfront costs, and 8–12% energy savings over the data center facility’s lifetime. The proposed framework therefore offers a scalable, AI-driven pathway to accelerate deployment, cut costs, and embed continuous optimization capabilities from day one in modern data-center infrastructure.

Zenodo (CERN European Organization for Nuclear Research)
University of Southern California (US), Georgia Institute of Technology (US), Auburn University (US)
Industry, innovation and infrastructure
Openalex Percentile: Top 36%
Education, Psychology, and Social Research
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

A stochastic optimization framework for AI-driven commissioning processes in data centers: Enhancing lifecycle efficiency and cost reduction · Zenodo (CERN European Organization for Nuclear Research) (2025) | TGRS Research Map | TGRS