Simulating JIT Implementation in Prefabricated Construction: a Digital Framework for Supply Chain Optimization

Construction industry efficiency continues to lag behind other sectors, particularly in prefabricated component supply chain management.While Just-in-Time (JIT) principles have proven successful in manufacturing, their application to construction supply chains remains challenging due to inherent variability in construction processes.This paper presents a Monte Carlo simulation approach to evaluate JIT implementation in prefabricated construction supply chains, focusing on modeling uncertainty in supply chain activities.The research employs triangular distributions to capture optimistic, most probable, and pessimistic scenarios for key construction activities.Through statistical analysis of 10,000 simulation iterations, we demonstrate the probability distributions of project completion times and identify critical activities affecting JIT implementation.Results show an 80% probability of project completion within 21 days and highlight specific activities, such as beam transport with a mean duration of 4.88 days, that significantly impact supply chain performance.The study reveals how activities with higher variability, particularly in beam lifting and quality control, can become potential bottlenecks in JIT implementation.This research contributes to both theory and practice by providing a probabilistic framework for evaluating JIT strategies in construction and identifying critical factors for successful implementation.

Publication Details

Journal
Annual Conference of the International Group for Lean Construction
Published
2025-06-02
DOI
https://doi.org/10.24928/2025/0158
Primary Topic
Geochemistry and Geologic Mapping
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Simulating JIT Implementation in Prefabricated Construction: a Digital Framework for Supply Chain Optimization

Annual Conference of the International Group for Lean Construction
Geochemistry and Geologic Mapping
article

Simulating JIT Implementation in Prefabricated Construction: a Digital Framework for Supply Chain Optimization

article en

Abstract

Construction industry efficiency continues to lag behind other sectors, particularly in prefabricated component supply chain management.While Just-in-Time (JIT) principles have proven successful in manufacturing, their application to construction supply chains remains challenging due to inherent variability in construction processes.This paper presents a Monte Carlo simulation approach to evaluate JIT implementation in prefabricated construction supply chains, focusing on modeling uncertainty in supply chain activities.The research employs triangular distributions to capture optimistic, most probable, and pessimistic scenarios for key construction activities.Through statistical analysis of 10,000 simulation iterations, we demonstrate the probability distributions of project completion times and identify critical activities affecting JIT implementation.Results show an 80% probability of project completion within 21 days and highlight specific activities, such as beam transport with a mean duration of 4.88 days, that significantly impact supply chain performance.The study reveals how activities with higher variability, particularly in beam lifting and quality control, can become potential bottlenecks in JIT implementation.This research contributes to both theory and practice by providing a probabilistic framework for evaluating JIT strategies in construction and identifying critical factors for successful implementation.

Annual Conference of the International Group for Lean Construction
Openalex Percentile: Top 47%
Geochemistry and Geologic Mapping
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Simulating JIT Implementation in Prefabricated Construction: a Digital Framework for Supply Chain Optimization · Annual Conference of the International Group for Lean Construction (2025) | TGRS Research Map | TGRS