PENJADWALAN ULANG PROYEK PEMBANGUNAN GEDUNG KANTOR 2 LANTAI MENGGUNAKAN METODE CPM (Studi Kasus Gedung Kantor BPBD Kabupaten Cilacap Jawa Tengah)

Project scheduling is one of the elements of results that can provide information about the schedule of plans and project progress, in this case the performance of resources in the form of costs, labor, equipment and materials as well as project duration plans and project completion time progress. The purpose of this research is to determine the critical path in the construction project of the Office 2 BPBD Cilacap Regency Jl. Swadaya No. 20 Pendowo Tambakreja, South Cilacap District, Cilacap Regency, Central Java Province and to determine the calculation of the increase in costs on the critical path using the CPM method. The method used in this study is descriptive qualitative research. The data in this study are secondary data and primary data. Based on research that has been carried out on the Cilacap Regency BPBD Office Building 2 Development project, Jl. Swadaya No. 20 Pendowo Tambakreja, South Cilacap District, Cilacap Regency, Central Java Province, with the CPM method network through the calculation of acceleration on the critical path, the total normal time for completion is 153 days to 114 days. Calculation of the increase in costs by increasing costs on the critical path to Rp. 430.135.033

Institutions

Publication Details

Journal
Jurnal Ilmiah Teknik Sipil
Published
2025-02-07
DOI
https://doi.org/10.25157/mediailmiahtekniksipil.v2i1.3456
Primary Topic
Library Science and Information Literacy
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

PENJADWALAN ULANG PROYEK PEMBANGUNAN GEDUNG KANTOR 2 LANTAI MENGGUNAKAN METODE CPM (Studi Kasus Gedung Kantor BPBD Kabupaten Cilacap Jawa Tengah)

Jurnal Ilmiah Teknik Sipil
Library Science and Information Literacy
article

PENJADWALAN ULANG PROYEK PEMBANGUNAN GEDUNG KANTOR 2 LANTAI MENGGUNAKAN METODE CPM (Studi Kasus Gedung Kantor BPBD Kabupaten Cilacap Jawa Tengah)

article en

Abstract

Project scheduling is one of the elements of results that can provide information about the schedule of plans and project progress, in this case the performance of resources in the form of costs, labor, equipment and materials as well as project duration plans and project completion time progress. The purpose of this research is to determine the critical path in the construction project of the Office 2 BPBD Cilacap Regency Jl. Swadaya No. 20 Pendowo Tambakreja, South Cilacap District, Cilacap Regency, Central Java Province and to determine the calculation of the increase in costs on the critical path using the CPM method. The method used in this study is descriptive qualitative research. The data in this study are secondary data and primary data. Based on research that has been carried out on the Cilacap Regency BPBD Office Building 2 Development project, Jl. Swadaya No. 20 Pendowo Tambakreja, South Cilacap District, Cilacap Regency, Central Java Province, with the CPM method network through the calculation of acceleration on the critical path, the total normal time for completion is 153 days to 114 days. Calculation of the increase in costs by increasing costs on the critical path to Rp. 430.135.033

Jurnal Ilmiah Teknik SipilVol. 2(1)
Universitas Galuh (ID)
Decent work and economic growth
Openalex Percentile: Top 47%
Library Science and Information Literacy
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.