PERENCANAAN PENGENDALIAN WAKTU DENGAN PROGRAM MICROSOFT PROJECT

The development of science and technology affects the development of construction projects. Effective construction project management is needed to overcome deviations that often occur during project implementation. The purpose of this study was to determine the work included in the critical trajectory to determine the duration of the construction project of the revitalization of SMP Negeri 2 Manonjaya. In this research using the Critical Path Method (CPM) method, the tools for operating this method with the Microsoft Project program. The results of this study resulted in a critical path in the form of other work activities, while the planned project duration was 150 working days, after analyzing the calculations obtained the duration of acceleration of the implementation of project activities with the CPM method and the Microsoft Project program for 16 days to 134 working days.

Institutions

Publication Details

Journal
Jurnal Ilmiah Teknik Sipil
Published
2025-08-08
DOI
https://doi.org/10.25157/mediailmiahtekniksipil.v2i2.4290
Primary Topic
Argentine historical studies
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

PERENCANAAN PENGENDALIAN WAKTU DENGAN PROGRAM MICROSOFT PROJECT

Jurnal Ilmiah Teknik Sipil
Argentine historical studies
article

PERENCANAAN PENGENDALIAN WAKTU DENGAN PROGRAM MICROSOFT PROJECT

article en

Abstract

The development of science and technology affects the development of construction projects. Effective construction project management is needed to overcome deviations that often occur during project implementation. The purpose of this study was to determine the work included in the critical trajectory to determine the duration of the construction project of the revitalization of SMP Negeri 2 Manonjaya. In this research using the Critical Path Method (CPM) method, the tools for operating this method with the Microsoft Project program. The results of this study resulted in a critical path in the form of other work activities, while the planned project duration was 150 working days, after analyzing the calculations obtained the duration of acceleration of the implementation of project activities with the CPM method and the Microsoft Project program for 16 days to 134 working days.

Jurnal Ilmiah Teknik SipilVol. 2(2)
Universitas Galuh (ID)
Openalex Percentile: Top 39%
Argentine historical studies
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.