ANALISIS PENGENDALIAN WAKTU DENGAN METODE PROGRAM EVALUATION AND REVIEW TECHNIQUE (PERT)

In the implementation of the Revitalization Development Project of SMP Negeri 2 Cikatomas, the purpose of this study is to determine the optimal duration and determine the difference between the existing project scheduling and the reschedule with the Program Evaluation and Review Technique (PERT).Method the selection of the Program Evaluation and Review Technique (PERT) method to reschedule, and time control by analyzing which project activities include critical trajectories to obtain the optimal project duration. The research method uses quantitative with descriptive analysis techniques,This analysis also uses network diagrams to generate project progress and relationships between activities.This research shows that project performance is not affected by the number of working days but rather the weight load carried out. The project duration in this study was 150 days, after rescheduling using the Program Evaluation and Review Technique (PERT) method the project was accelerated by 21 days to 129 working days

Institutions

Publication Details

Journal
Jurnal Ilmiah Teknik Sipil
Published
2025-08-08
DOI
https://doi.org/10.25157/mediailmiahtekniksipil.v2i2.4289
Primary Topic
Geochemistry and Geologic Mapping
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

ANALISIS PENGENDALIAN WAKTU DENGAN METODE PROGRAM EVALUATION AND REVIEW TECHNIQUE (PERT)

Jurnal Ilmiah Teknik Sipil
Geochemistry and Geologic Mapping
article

ANALISIS PENGENDALIAN WAKTU DENGAN METODE PROGRAM EVALUATION AND REVIEW TECHNIQUE (PERT)

article en

Abstract

In the implementation of the Revitalization Development Project of SMP Negeri 2 Cikatomas, the purpose of this study is to determine the optimal duration and determine the difference between the existing project scheduling and the reschedule with the Program Evaluation and Review Technique (PERT).Method the selection of the Program Evaluation and Review Technique (PERT) method to reschedule, and time control by analyzing which project activities include critical trajectories to obtain the optimal project duration. The research method uses quantitative with descriptive analysis techniques,This analysis also uses network diagrams to generate project progress and relationships between activities.This research shows that project performance is not affected by the number of working days but rather the weight load carried out. The project duration in this study was 150 days, after rescheduling using the Program Evaluation and Review Technique (PERT) method the project was accelerated by 21 days to 129 working days

Jurnal Ilmiah Teknik SipilVol. 2(2)
Universitas Galuh (ID)
Openalex Percentile: Top 27%
Geochemistry and Geologic Mapping
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

ANALISIS PENGENDALIAN WAKTU DENGAN METODE PROGRAM EVALUATION AND REVIEW TECHNIQUE (PERT) · Jurnal Ilmiah Teknik Sipil (2025) | TGRS Research Map | TGRS