ANALISIS PERBANDINGAN ESTIMASI ANGGARAN BIAYA ANTARA METODE SNI DAN AHSP

Planning a construction requires cost estimation analysis to estimate expenditure needs and obtain the most efficient costs for construction. Cost estimation plays an important role in implementing a construction project, contractors must have guidelines that are economical and applicable in Indonesia. This cost analysis is the basis for calculations used in project budget planning. In the Flood Control Project in Wanareja District, the author will examine which method is the most economical between the SNI Method and the AHSP Method which aims to be a reference for estimators in planning construction costs using the methods applicable in Indonesia. Based on the calculation results of the Cost Budget Plan for the Flood Control project, Wanareja District, Cilacap Regency using two methods, namely the AHSP method and the SNI method, the AHSP method cost results were Rp. 7,811,998,000.00 (Seven Billion Eight Hundred Eleven Million Nine Hundred Ninety Eight Thousand Rupiah) SNI method amounting to IDR 7,428,562,000.00. (Seven Billion Four Hundred Twenty Eight Million Five Hundred Sixty Two Thousand Rupiah). As for the comparison of estimated budget costs between the 2023 SNI Method and the 2023 AHSP Method, the most economical is the SNI method with a total difference of Rp. 383,436,000,- or around 5.16% of the RAB using the AHSP method

Institutions

Publication Details

Journal
Jurnal Ilmiah Teknik Sipil
Published
2025-08-08
DOI
https://doi.org/10.25157/mediailmiahtekniksipil.v2i2.4474
Primary Topic
Geochemistry and Geologic Mapping
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

ANALISIS PERBANDINGAN ESTIMASI ANGGARAN BIAYA ANTARA METODE SNI DAN AHSP

Jurnal Ilmiah Teknik Sipil
Geochemistry and Geologic Mapping
article

ANALISIS PERBANDINGAN ESTIMASI ANGGARAN BIAYA ANTARA METODE SNI DAN AHSP

article en

Abstract

Planning a construction requires cost estimation analysis to estimate expenditure needs and obtain the most efficient costs for construction. Cost estimation plays an important role in implementing a construction project, contractors must have guidelines that are economical and applicable in Indonesia. This cost analysis is the basis for calculations used in project budget planning. In the Flood Control Project in Wanareja District, the author will examine which method is the most economical between the SNI Method and the AHSP Method which aims to be a reference for estimators in planning construction costs using the methods applicable in Indonesia. Based on the calculation results of the Cost Budget Plan for the Flood Control project, Wanareja District, Cilacap Regency using two methods, namely the AHSP method and the SNI method, the AHSP method cost results were Rp. 7,811,998,000.00 (Seven Billion Eight Hundred Eleven Million Nine Hundred Ninety Eight Thousand Rupiah) SNI method amounting to IDR 7,428,562,000.00. (Seven Billion Four Hundred Twenty Eight Million Five Hundred Sixty Two Thousand Rupiah). As for the comparison of estimated budget costs between the 2023 SNI Method and the 2023 AHSP Method, the most economical is the SNI method with a total difference of Rp. 383,436,000,- or around 5.16% of the RAB using the AHSP method

Jurnal Ilmiah Teknik SipilVol. 2(2)
Universitas Galuh (ID)
Openalex Percentile: Top 27%
Geochemistry and Geologic Mapping
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.