Project Wip Management as a Risk Control Driver for Timely Completion

This research addresses a critical gap in construction management by introducing novel indicators for assessing completion through Work-In-Process (WIP) management.The study reveals that project production management practitioners frequently equate physical progress with completion, a misconception contributing to unexpected project delays.Through production systems patterns analysis, this research introduces Rate of WIP (RWIP), Rate of Completion Convergence (RCC), and complementary metrics for multiple production systems completion (Q6) and maximum achievable completion (Q6').These indicators, grounded in Little's Law principles, provide a framework for monitoring completion trends and predicting schedule overruns.The methodology combines modeling with practitioner surveys, demonstrating how WIP patterns serve as early warning signals for potential delays for unstable production systems, enabling proactive schedule risk management and improved project delivery reliability.

Institutions

Publication Details

Journal
Annual Conference of the International Group for Lean Construction
Published
2025-06-02
DOI
https://doi.org/10.24928/2025/0296
Primary Topic
Geochemistry and Geologic Mapping
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Project Wip Management as a Risk Control Driver for Timely Completion

Annual Conference of the International Group for Lean Construction
Geochemistry and Geologic Mapping
article

Project Wip Management as a Risk Control Driver for Timely Completion

article en

Abstract

This research addresses a critical gap in construction management by introducing novel indicators for assessing completion through Work-In-Process (WIP) management.The study reveals that project production management practitioners frequently equate physical progress with completion, a misconception contributing to unexpected project delays.Through production systems patterns analysis, this research introduces Rate of WIP (RWIP), Rate of Completion Convergence (RCC), and complementary metrics for multiple production systems completion (Q6) and maximum achievable completion (Q6').These indicators, grounded in Little's Law principles, provide a framework for monitoring completion trends and predicting schedule overruns.The methodology combines modeling with practitioner surveys, demonstrating how WIP patterns serve as early warning signals for potential delays for unstable production systems, enabling proactive schedule risk management and improved project delivery reliability.

Annual Conference of the International Group for Lean Construction
Pontifícia Universidade Católica do Paraná (BR)
Openalex Percentile: Top 48%
Geochemistry and Geologic Mapping
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Project Wip Management as a Risk Control Driver for Timely Completion · Annual Conference of the International Group for Lean Construction (2025) | TGRS Research Map | TGRS