PERENCANAAN PENJADWALAN PROYEK DENGAN MENGGUNAKAN PROGRAM MICROSOFT PROJECT 2013

The implementation of project development must be planned as well as possible, both in terms of time and cost to achieve maximum results. Time and cost have a significant influence on project success and failure. To measure project success, it is usually seen from the completion time and minimum costs without reducing quality. Al-Mukhtar Integrated Islamic Middle School Revitalization Development Project, Sariwangi District. It is indicated that Tasikmalaya is experiencing delays in the implementation process. The aim of this research is to determine the optimal time and costs resulting from accelerating working hours (overtime) using the Crash Duration method and, alternatively, adding 2 hours of working hours (overtime) to jobs that are on the critical path. Data analysis in this research uses Microsoft Project 2013 to determine the critical path. Based on the results of the calculation analysis with the addition of 2 working hours (overtime) resulting in an optimal time of 142 working days with a normal duration of 150 days, an acceleration of 8 working days is obtained with a project time efficiency of 5.3% and a cost reduction of 0.65% or Rp. 4,538,177.00 from the normal cost of Rp. 700,531,800.00 to Rp. 695,993,629.00.

Institutions

Publication Details

Journal
Jurnal Ilmiah Teknik Sipil
Published
2025-08-08
DOI
https://doi.org/10.25157/mediailmiahtekniksipil.v2i2.4293
Primary Topic
SARS-CoV-2 and COVID-19 Research
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

PERENCANAAN PENJADWALAN PROYEK DENGAN MENGGUNAKAN PROGRAM MICROSOFT PROJECT 2013

Jurnal Ilmiah Teknik Sipil
SARS-CoV-2 and COVID-19 Research
article

PERENCANAAN PENJADWALAN PROYEK DENGAN MENGGUNAKAN PROGRAM MICROSOFT PROJECT 2013

article en

Abstract

The implementation of project development must be planned as well as possible, both in terms of time and cost to achieve maximum results. Time and cost have a significant influence on project success and failure. To measure project success, it is usually seen from the completion time and minimum costs without reducing quality. Al-Mukhtar Integrated Islamic Middle School Revitalization Development Project, Sariwangi District. It is indicated that Tasikmalaya is experiencing delays in the implementation process. The aim of this research is to determine the optimal time and costs resulting from accelerating working hours (overtime) using the Crash Duration method and, alternatively, adding 2 hours of working hours (overtime) to jobs that are on the critical path. Data analysis in this research uses Microsoft Project 2013 to determine the critical path. Based on the results of the calculation analysis with the addition of 2 working hours (overtime) resulting in an optimal time of 142 working days with a normal duration of 150 days, an acceleration of 8 working days is obtained with a project time efficiency of 5.3% and a cost reduction of 0.65% or Rp. 4,538,177.00 from the normal cost of Rp. 700,531,800.00 to Rp. 695,993,629.00.

Jurnal Ilmiah Teknik SipilVol. 2(2)
Universitas Galuh (ID)
Industry, innovation and infrastructure
Openalex Percentile: Top 43%
SARS-CoV-2 and COVID-19 Research
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

PERENCANAAN PENJADWALAN PROYEK DENGAN MENGGUNAKAN PROGRAM MICROSOFT PROJECT 2013 · Jurnal Ilmiah Teknik Sipil (2025) | TGRS Research Map | TGRS