Analysis of Public Participation in Public Hearings during the Environmental Licensing Process of Nova Ferroeste

Public participation in Environmental Licensing is essential and is primarily expressed through Public Hearings conducted prior to project implementation. Although these are not deliberative spaces, the public has the freedom to present criticisms or suggestions, influencing the licensing authority’s decision-making process. Through an exploratory documentary study with a qualitative approach, this research aims to analyze the contributions arising from the Public Hearings held by Ibama during the environmental licensing process for the 'Nova Ferroeste' railway project, located between the states of Mato Grosso do Sul and Paraná. Approximately 3.000 participants attended the seven hearings conducted, with 184 statements or remarks recorded, divided into 416 interventions or topics addressed, including questions, requests, or the presentation of information. Due to the project's large scale, varying public interests were observed depending on the region affected. Three main themes emerged as key concerns for participants: the crossing of the Serra do Mar mountain range, the impacts on small properties in the São José dos Pinhais/PR region, and the effects on traditional communities in the Dourados/MS region. Despite criticisms about the effectiveness of the current format of public hearings, allegedly due to their limited capacity to influence decision-making, it is concluded that analyzing social participation and the contributions received—particularly the three aforementioned themes—supported the technical feasibility analysis of Nova Ferroeste and the decision to return the initial version of the EIA/RIMA. This underscores the importance of this instrument in assessing the feasibility of projects with significant socio-environmental complexity.

Institutions

Publication Details

Journal
Raega - O Espaço Geográfico em Análise
Published
2025-04-28
DOI
https://doi.org/10.5380/raega.v62i1.98546
Primary Topic
Geochemistry and Geologic Mapping
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Analysis of Public Participation in Public Hearings during the Environmental Licensing Process of Nova Ferroeste

Raega - O Espaço Geográfico em Análise
Geochemistry and Geologic Mapping
article

Analysis of Public Participation in Public Hearings during the Environmental Licensing Process of Nova Ferroeste

article en

Abstract

Public participation in Environmental Licensing is essential and is primarily expressed through Public Hearings conducted prior to project implementation. Although these are not deliberative spaces, the public has the freedom to present criticisms or suggestions, influencing the licensing authority’s decision-making process. Through an exploratory documentary study with a qualitative approach, this research aims to analyze the contributions arising from the Public Hearings held by Ibama during the environmental licensing process for the 'Nova Ferroeste' railway project, located between the states of Mato Grosso do Sul and Paraná. Approximately 3.000 participants attended the seven hearings conducted, with 184 statements or remarks recorded, divided into 416 interventions or topics addressed, including questions, requests, or the presentation of information. Due to the project's large scale, varying public interests were observed depending on the region affected. Three main themes emerged as key concerns for participants: the crossing of the Serra do Mar mountain range, the impacts on small properties in the São José dos Pinhais/PR region, and the effects on traditional communities in the Dourados/MS region. Despite criticisms about the effectiveness of the current format of public hearings, allegedly due to their limited capacity to influence decision-making, it is concluded that analyzing social participation and the contributions received—particularly the three aforementioned themes—supported the technical feasibility analysis of Nova Ferroeste and the decision to return the initial version of the EIA/RIMA. This underscores the importance of this instrument in assessing the feasibility of projects with significant socio-environmental complexity.

Raega - O Espaço Geográfico em AnáliseVol. 62(1)
Brazilian Institute of Environment and Renewable Natural Resources (BR), Universidade de Brasília (BR)
Peace, Justice and strong institutions
Openalex Percentile: Top 27%
Geochemistry and Geologic Mapping
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Analysis of Public Participation in Public Hearings during the Environmental Licensing Process of Nova Ferroeste · Raega - O Espaço Geográfico em Análise (2025) | TGRS Research Map | TGRS