Analisis Value Engineering Dengan Metode Zero-One Pada Proyek Pembangunan Gedung

Value Engineering is a systematically organised activity in identifying products or services in fulfilling the required functions at the most economical cost. The purpose of Value Engineering analysis is to analyse high-cost work and figure out alternatives with the lowest cost without reducing qualities, at Idrisiyyah Islamic Boarding School Education Building Construction Project. Datas was obtained from PT Usaha Mandiri Idrisiyyah as the contractor, in the form of a Cost Budget Plan, Shop Drawings, and questionnaire results from five respondents. This research was conducted through five stages, consisting of the information stage, creative stage, analysis stage, development stage and recommendation stage, with data analysis using Zero-One method. Breakdown results on Architectural work, obtained 5 jobs that use the largest costs include floor finishing, walls, ceilings, plastering, and wall painting. The Initial Cost Budget is Rp. 4,261,026,943.10. After Value Engineering analysis, there was obtained a new Cost Budget Rp. 4,082,669,925.95, with a cost difference worth Rp. 178,357,017.15 or 4.18%.

Institutions

Publication Details

Journal
Jurnal Ilmiah Teknik Sipil
Published
2025-02-07
DOI
https://doi.org/10.25157/mediailmiahtekniksipil.v2i1.3465
Primary Topic
Food Security and Health in Diverse Populations
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Analisis Value Engineering Dengan Metode Zero-One Pada Proyek Pembangunan Gedung

Jurnal Ilmiah Teknik Sipil
Food Security and Health in Diverse Populations
article

Analisis Value Engineering Dengan Metode Zero-One Pada Proyek Pembangunan Gedung

article en

Abstract

Value Engineering is a systematically organised activity in identifying products or services in fulfilling the required functions at the most economical cost. The purpose of Value Engineering analysis is to analyse high-cost work and figure out alternatives with the lowest cost without reducing qualities, at Idrisiyyah Islamic Boarding School Education Building Construction Project. Datas was obtained from PT Usaha Mandiri Idrisiyyah as the contractor, in the form of a Cost Budget Plan, Shop Drawings, and questionnaire results from five respondents. This research was conducted through five stages, consisting of the information stage, creative stage, analysis stage, development stage and recommendation stage, with data analysis using Zero-One method. Breakdown results on Architectural work, obtained 5 jobs that use the largest costs include floor finishing, walls, ceilings, plastering, and wall painting. The Initial Cost Budget is Rp. 4,261,026,943.10. After Value Engineering analysis, there was obtained a new Cost Budget Rp. 4,082,669,925.95, with a cost difference worth Rp. 178,357,017.15 or 4.18%.

Jurnal Ilmiah Teknik SipilVol. 2(1)
Universitas Galuh (ID)
Openalex Percentile: Top 33%
Food Security and Health in Diverse Populations
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.