Maximum Analysis of Human Resource Availability Units in the Construction of the Banjar Wongaya Betan Tabanan Multipurpose Center

Human resources are very important in the implementation of construction projects. Improper allocation of human resources can lead to overallocation of human resources, which reduces work productivity. In the time schedule report for the realization of the Banjar Wongaya Betan Multipurpose Hall Development Project in Tabanan Regency, there was a discrepancy between the actual progress and the planned progress, resulting in delays in implementation. Based on these issues, research was conducted to determine the comparison between the maximum unit requirements and availability before and after Resources Leveling was carried out using Microsoft Office Project 2019. Based on the analysis results, it was found that the number of human resources that were initially over-allocated could be optimized after the leveling process was carried out using the resources leveling method with Microsoft Office Project 2019. The total human resource requirements and availability, which were initially 48.26 people and 37 people, became 32.13 people and 37.00 people after leveling, which means that human resources are sufficient for project implementation. The leveling results data can be used as evaluation material and benchmarks for subsequent projects.

Institutions

Publication Details

Journal
Jurnal Ilmiah Telsinas Elektro Sipil dan Teknik Informasi
Published
2025-09-09
DOI
https://doi.org/10.38043/telsinas.v8i2.6941
Primary Topic
Digital Imaging for Blood Diseases
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Maximum Analysis of Human Resource Availability Units in the Construction of the Banjar Wongaya Betan Tabanan Multipurpose Center

Jurnal Ilmiah Telsinas Elektro Sipil dan Teknik Informasi
Digital Imaging for Blood Diseases
article

Maximum Analysis of Human Resource Availability Units in the Construction of the Banjar Wongaya Betan Tabanan Multipurpose Center

article en

Abstract

Human resources are very important in the implementation of construction projects. Improper allocation of human resources can lead to overallocation of human resources, which reduces work productivity. In the time schedule report for the realization of the Banjar Wongaya Betan Multipurpose Hall Development Project in Tabanan Regency, there was a discrepancy between the actual progress and the planned progress, resulting in delays in implementation. Based on these issues, research was conducted to determine the comparison between the maximum unit requirements and availability before and after Resources Leveling was carried out using Microsoft Office Project 2019. Based on the analysis results, it was found that the number of human resources that were initially over-allocated could be optimized after the leveling process was carried out using the resources leveling method with Microsoft Office Project 2019. The total human resource requirements and availability, which were initially 48.26 people and 37 people, became 32.13 people and 37.00 people after leveling, which means that human resources are sufficient for project implementation. The leveling results data can be used as evaluation material and benchmarks for subsequent projects.

Jurnal Ilmiah Telsinas Elektro Sipil dan Teknik InformasiVol. 8(2)
Universitas Mahasaraswati Denpasar (ID)
Decent work and economic growth
Openalex Percentile: Top 46%
Digital Imaging for Blood Diseases
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Maximum Analysis of Human Resource Availability Units in the Construction of the Banjar Wongaya Betan Tabanan Multipurpose Center · Jurnal Ilmiah Telsinas Elektro Sipil dan Teknik Informasi (2025) | TGRS Research Map | TGRS