Failure Analysis of Fatigue Cracking in Hydrocarbon-Exposed Austenitic Stainless Steel Piping: A Case Study

Fatigue cracking in hydrocarbon-exposed austenitic stainless steel piping is a primary concern in the petrochemical industry, as it can lead to structural failures and premature plant shutdowns. This study investigates the failure of a hydrocarbon vapor stainless steel pipe used in a petrochemical plant through visual inspection, stereoscopy, monitoring vibration, and scanning electron microscopy (SEM). The results reveal that the fatigue crack originated at the toe of the weld, where stress concentration was significant, and propagated circumferentially. Major contributing factors to the failure include welding defects, residual stress accumulation, and excessive vibration from the gas blower. The presence of chevron marks and fatigue striations on the fracture surface indicates that vibration-induced fatigue was the primary failure mechanism. To prevent future failures, improvements in welding quality control and the implementation of vibration suppression techniques, such as dampers, are recommended. This case study provides essential knowledge into failure prevention measures for critical piping components in petrochemical plants and can serve as a guide for similar applications in the industry.

Institutions

Publication Details

Journal
Journal of Pipeline Systems Engineering and Practice
Published
2025-09-26
DOI
https://doi.org/10.1061/jpsea2.pseng-1942
Primary Topic
Uterine Myomas and Treatments
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Failure Analysis of Fatigue Cracking in Hydrocarbon-Exposed Austenitic Stainless Steel Piping: A Case Study

Journal of Pipeline Systems Engineering and Practice
Uterine Myomas and Treatments
article

Failure Analysis of Fatigue Cracking in Hydrocarbon-Exposed Austenitic Stainless Steel Piping: A Case Study

article en

Abstract

Fatigue cracking in hydrocarbon-exposed austenitic stainless steel piping is a primary concern in the petrochemical industry, as it can lead to structural failures and premature plant shutdowns. This study investigates the failure of a hydrocarbon vapor stainless steel pipe used in a petrochemical plant through visual inspection, stereoscopy, monitoring vibration, and scanning electron microscopy (SEM). The results reveal that the fatigue crack originated at the toe of the weld, where stress concentration was significant, and propagated circumferentially. Major contributing factors to the failure include welding defects, residual stress accumulation, and excessive vibration from the gas blower. The presence of chevron marks and fatigue striations on the fracture surface indicates that vibration-induced fatigue was the primary failure mechanism. To prevent future failures, improvements in welding quality control and the implementation of vibration suppression techniques, such as dampers, are recommended. This case study provides essential knowledge into failure prevention measures for critical piping components in petrochemical plants and can serve as a guide for similar applications in the industry.

Journal of Pipeline Systems Engineering and PracticeVol. 17(1)
Rajamangala University of Technology Isan (TH), Kasetsart University (TH), King Mongkut's University of Technology North Bangkok (TH)
Openalex Percentile: Top 35%
Uterine Myomas and Treatments
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Failure Analysis of Fatigue Cracking in Hydrocarbon-Exposed Austenitic Stainless Steel Piping: A Case Study · Journal of Pipeline Systems Engineering and Practice (2025) | TGRS Research Map | TGRS