Design Management in High-rise Building Projects in Chile

Low productivity in high-rise building projects represents a recurring challenge in Chile, often linked to deficiencies in management during the design phase.This process, crucial for project coordination and success, is affected by fragmented roles, lack of integrated methodologies, and limited adoption of internationally recommended practices.Despite its relevance, little research has addressed how this stage is currently managed in the Chilean context.This study evaluates the design management of high-rise building projects by identifying design processes, characterizing the temporary organization formed by professionals, and analyzing their role participation.The methodology included a literature review, expert validation, surveys, and interviews with industry professionals.A total of 22 specific processes were identified across Preliminary, Basic, and Detailed design phases, and 12 roles were mapped to these processes.The study compares current practices with good practices from the literature, including project management standards and Lean, BIM, and Agile methodologies.The results reveal discrepancies between ideal and actual role involvement, operational fragmentation, and limited application of management tools.These findings highlight key areas for improvement in the Chilean construction sector and provide a foundation for future research.

Publication Details

Journal
Annual Conference of the International Group for Lean Construction
Published
2025-06-02
DOI
https://doi.org/10.24928/2025/0273
Primary Topic
Advanced Memory and Neural Computing
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Design Management in High-rise Building Projects in Chile

Annual Conference of the International Group for Lean Construction
Advanced Memory and Neural Computing
article

Design Management in High-rise Building Projects in Chile

article en

Abstract

Low productivity in high-rise building projects represents a recurring challenge in Chile, often linked to deficiencies in management during the design phase.This process, crucial for project coordination and success, is affected by fragmented roles, lack of integrated methodologies, and limited adoption of internationally recommended practices.Despite its relevance, little research has addressed how this stage is currently managed in the Chilean context.This study evaluates the design management of high-rise building projects by identifying design processes, characterizing the temporary organization formed by professionals, and analyzing their role participation.The methodology included a literature review, expert validation, surveys, and interviews with industry professionals.A total of 22 specific processes were identified across Preliminary, Basic, and Detailed design phases, and 12 roles were mapped to these processes.The study compares current practices with good practices from the literature, including project management standards and Lean, BIM, and Agile methodologies.The results reveal discrepancies between ideal and actual role involvement, operational fragmentation, and limited application of management tools.These findings highlight key areas for improvement in the Chilean construction sector and provide a foundation for future research.

Annual Conference of the International Group for Lean Construction
Sustainable cities and communities
Openalex Percentile: Top 19%
Advanced Memory and Neural Computing
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.