PENGARUH BURNOUT DAN TEAMWORK TERHADAP PRODUKTIVITAS TENAGA KERJA KONSTRUKSI BAGIAN PRODUKSI PT. GAMA WASKITA GRAHA

AbstractThis study aims to test the effect of burnout and teamwork on theproductivity of the construction workforce in the production section ofPT Gama Waskita Graha. By using 53 samples as research respondentswho worked at PT Gama Waskita Graha for one month to the last twoyears. The test was conducted using SPSS version 26 software withmultiple linear regression test analysis. The regression results showpartially that burnout has a positive and significant effect on theproductivity of the production construction workforce at PT GamaWaskita Graha and teamwork has a positive and significant effect on theproductivity of the production construction workforce at PT GamaWaskita Graha. This research can be used by companies in determiningpolicies or programs to increase the achievement of work productivitytargets through burnout and teamwork factors. This research haslimitations that only focus on the construction sector, so the results areless applicable to other sectors.Keywords: Burnout, Teamwork, Work productivity

Institutions

Publication Details

Journal
Zenodo (CERN European Organization for Nuclear Research)
Published
2025-09-25
DOI
https://doi.org/10.5281/zenodo.17198735
Primary Topic
Education, Psychology, and Social Research
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

PENGARUH BURNOUT DAN TEAMWORK TERHADAP PRODUKTIVITAS TENAGA KERJA KONSTRUKSI BAGIAN PRODUKSI PT. GAMA WASKITA GRAHA

Zenodo (CERN European Organization for Nuclear Research)
Education, Psychology, and Social Research
article

PENGARUH BURNOUT DAN TEAMWORK TERHADAP PRODUKTIVITAS TENAGA KERJA KONSTRUKSI BAGIAN PRODUKSI PT. GAMA WASKITA GRAHA

article en

Abstract

AbstractThis study aims to test the effect of burnout and teamwork on theproductivity of the construction workforce in the production section ofPT Gama Waskita Graha. By using 53 samples as research respondentswho worked at PT Gama Waskita Graha for one month to the last twoyears. The test was conducted using SPSS version 26 software withmultiple linear regression test analysis. The regression results showpartially that burnout has a positive and significant effect on theproductivity of the production construction workforce at PT GamaWaskita Graha and teamwork has a positive and significant effect on theproductivity of the production construction workforce at PT GamaWaskita Graha. This research can be used by companies in determiningpolicies or programs to increase the achievement of work productivitytargets through burnout and teamwork factors. This research haslimitations that only focus on the construction sector, so the results areless applicable to other sectors.Keywords: Burnout, Teamwork, Work productivity

Zenodo (CERN European Organization for Nuclear Research)
Universitas Muhammadiyah Gresik (ID)
Openalex Percentile: Top 36%
Education, Psychology, and Social Research
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.