Interruption strategy of fault current fed by high-capacity generator based on phase selection and current-zero prediction
• Low-arc-energy interruption strategy for generator circuit breakers. • Optimal first-pole-to-clear selection is the phase with medium asymmetrical degree. • Contacts are controlled to separate near predicted current zeros at the end of small half-waves. • Combining optimal pole selection and current-zero prediction ensures low arc energy and high reliability. The high asymmetrical degree (AD, >100 %) of the fault current fed by high-capacity turbine generator (HTG) results in high arc energy ( E arc ), hindering reliable interruptions of generator circuit breakers (GCBs). Traditional GCBs with simultaneous three-phase separation at random moments suffer from uncontrollable arcing time and high E arc , severely undermining the interruption reliability of GCB. To limit E arc , GCBs with phase-separated operation mechanism should be applied, along with the first pole to clear (FPTC) selection and ideal current-zero prediction. Contributions of the paper are: first, it is revealed the phase with medium AD should be selected as the FPTC, and contacts should be controlled to separate near the current zero at the end of a small half-wave. Second, combined with FPTC selection and ideal current-zero prediction, an interruption strategy is proposed, which can limit E arc to <50 kJ in random faults, improving the GCB interrupting reliability for highly asymmetrical currents. Simulation results verified its effectiveness.
Institutions
- Tianjin University (CN)
- Highlands and Islands Enterprise (GB)
Publication Details
- Journal
- International Journal of Electrical Power & Energy Systems
- Published
- 2025-09-24
- DOI
- https://doi.org/10.1016/j.ijepes.2025.111162
- Primary Topic
- Water Systems and Optimization
- Type
- article
- Field-Weighted Citation Impact
- 0.00