“What Is This Thing Called Controllability?” A Field Study of the Integration of the Controllability Principle in the Redesign of a Performance Measurement System

ABSTRACT This longitudinal study investigates the integration of the controllability principle in the redesign of a performance measurement system (PMS). The PMS and the controllability principle are conceptualized as “epistemic objects” (open, question-generating, and complex objects) which are associated with varying stakeholder desires. The paper makes two contributions. First, it demonstrates how a PMS can oscillate between different interpretations of the controllability principle (narrow versus broad), resulting in different controllability boundaries (tight versus loose). Second, the paper theorizes how multiple epistemic objects are formed into combination structures (a combination of epistemic objects that are subsequently codeveloped). Three sequentially developed combination structures of the controllability principle and the PMS, along with their associated effects, are reported. The paper demonstrates how combination structures can, ironically, become antithetical to the desires that set change in motion, and in this case, render the PMS incapable of measuring performance on complex environmental and societal challenges.

Institutions

Publication Details

Journal
The Accounting Review
Published
2025-09-22
DOI
https://doi.org/10.2308/tar-2024-0295
Primary Topic
Economic, financial, and policy analysis
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

“What Is This Thing Called Controllability?” A Field Study of the Integration of the Controllability Principle in the Redesign of a Performance Measurement System

The Accounting Review
Economic, financial, and policy analysis
article

“What Is This Thing Called Controllability?” A Field Study of the Integration of the Controllability Principle in the Redesign of a Performance Measurement System

article en

Abstract

ABSTRACT This longitudinal study investigates the integration of the controllability principle in the redesign of a performance measurement system (PMS). The PMS and the controllability principle are conceptualized as “epistemic objects” (open, question-generating, and complex objects) which are associated with varying stakeholder desires. The paper makes two contributions. First, it demonstrates how a PMS can oscillate between different interpretations of the controllability principle (narrow versus broad), resulting in different controllability boundaries (tight versus loose). Second, the paper theorizes how multiple epistemic objects are formed into combination structures (a combination of epistemic objects that are subsequently codeveloped). Three sequentially developed combination structures of the controllability principle and the PMS, along with their associated effects, are reported. The paper demonstrates how combination structures can, ironically, become antithetical to the desires that set change in motion, and in this case, render the PMS incapable of measuring performance on complex environmental and societal challenges.

The Accounting ReviewVol. 101(1)
The University of Sydney (AU), Stockholm School of Economics (SE), Australian Regenerative Medicine Institute (AU), Monash University (AU)
Openalex Percentile: Top 37%
Economic, financial, and policy analysis
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.