Automated Construction Sequencing Optimization via Multi-Modal Data Fusion and Deep Reinforcement Learning
**Abstract:** This paper introduces a novel framework for automated construction sequencing optimization using multi-modal data fusion and deep reinforcement learning (DRL). Conventional construction scheduling methods often rely on static data and limited predictive capabilities, leading to inefficiencies and cost overruns. We present a system that dynamically analyzes project plans, environmental conditions, resource availability, and historical performance data to generate optimized activity sequences. The system leverages a multi-layered evaluation pipeline coupled with a hyper-score calculation architecture to provide quantifiable and actionable insights, demonstrating a 15% improvement in project completion speed and a 10% reduction in overall project cost compared to traditional scheduling techniques in simulated real-world scenarios. This system's adaptability and scalability position it for immediate commercial application in large-scale construction projects.
Institutions
- Freed–Hardeman University (US)
Publication Details
- Journal
- Zenodo (CERN European Organization for Nuclear Research)
- Published
- 2025-09-21
- DOI
- https://doi.org/10.5281/zenodo.17172081
- Primary Topic
- Geochemistry and Geologic Mapping
- Type
- article
- Field-Weighted Citation Impact
- 0.00