Integrasi BIM Dalam Pemodelan Dan Penjadwalan Proyek Renovasi Masjid Al-Muttahidin Payakumbuh

This study discusses the application of Building Information Modeling (BIM) to the Al-Muttahidin Mosque construction project in Payakumbuh, which was built on the land of an existing mosque. The complexity of this project requires a planning strategy that takes into account safety, scheduling, and coordination between demolition and construction work. Modeling was carried out using Autodesk Revit 2023 to create 3D models of the old and new buildings, then analyzing the work sequence through integration with Microsoft Project and 4D simulation using Autodesk Navisworks Manage. The results show that BIM modeling facilitates the identification of design conflicts, work sequence planning, and construction activity duration estimation. The project requires 39 work items with a total duration of 201 days, of which the existing mosque cannot be used for 54 days due to safety aspects. This study confirms that BIM plays a significant role in improving scheduling efficiency, minimizing the risk of construction conflicts, and supporting the visualization of the project implementation process.

Institutions

Publication Details

Journal
Jurnal Bangunan Konstruksi & Desain
Published
2025-03-30
DOI
https://doi.org/10.25077/jbkd.3.1.1-10.2025
Citations
1
Primary Topic
Occupational Health and Safety Management
Type
article
Field-Weighted Citation Impact
5.77
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Integrasi BIM Dalam Pemodelan Dan Penjadwalan Proyek Renovasi Masjid Al-Muttahidin Payakumbuh

1 citations
Jurnal Bangunan Konstruksi & Desain
Occupational Health and Safety Management
5.77
article

Integrasi BIM Dalam Pemodelan Dan Penjadwalan Proyek Renovasi Masjid Al-Muttahidin Payakumbuh

article en
1 citations

Abstract

This study discusses the application of Building Information Modeling (BIM) to the Al-Muttahidin Mosque construction project in Payakumbuh, which was built on the land of an existing mosque. The complexity of this project requires a planning strategy that takes into account safety, scheduling, and coordination between demolition and construction work. Modeling was carried out using Autodesk Revit 2023 to create 3D models of the old and new buildings, then analyzing the work sequence through integration with Microsoft Project and 4D simulation using Autodesk Navisworks Manage. The results show that BIM modeling facilitates the identification of design conflicts, work sequence planning, and construction activity duration estimation. The project requires 39 work items with a total duration of 201 days, of which the existing mosque cannot be used for 54 days due to safety aspects. This study confirms that BIM plays a significant role in improving scheduling efficiency, minimizing the risk of construction conflicts, and supporting the visualization of the project implementation process.

Jurnal Bangunan Konstruksi & DesainVol. 3(1)
Andalas University (ID)
Sustainable cities and communities
Openalex Percentile: Top 3%
Occupational Health and Safety Management
5.77
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.