Two-agent scheduling with time-dependent and position-dependent in a flow-shop system

In this paper, we consider the two-agent scheduling with time-dependent and position-dependent processing time in a two-machine flow-shop system. The objective is to minimize the makespan of agent A under the constraint that the objective of agent B cannot exceed a given upper bound. In the time-dependent processing time model, the constraint is the makespan of agent B. We first show that the problem is NP-hard in the ordinary sense. Then we prove that there exists an optimal schedule which is a permutation schedule, and there exists an optimal schedule in which the adapted version of Johnson’s rule do not hold for neither agent A nor agent B. Furthermore, we show that three special cases are polynomially solvable. In the position-dependent processing time model, if the constraint is the makespan of agent B, we show that the problem is NP-hard in the ordinary sense. If the constraint is the total completion times of agent B and jobs have different release dates, the problem is strongly NP-hard.

Publication Details

Journal
Springer Link (Chiba Institute of Technology)
Published
2025-10-31
DOI
https://doi.org/10.1051/ro/2025126/pdf
Primary Topic
Agriculture, Water, and Health
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Two-agent scheduling with time-dependent and position-dependent in a flow-shop system

Springer Link (Chiba Institute of Technology)
Agriculture, Water, and Health
article

Two-agent scheduling with time-dependent and position-dependent in a flow-shop system

article en

Abstract

In this paper, we consider the two-agent scheduling with time-dependent and position-dependent processing time in a two-machine flow-shop system. The objective is to minimize the makespan of agent A under the constraint that the objective of agent B cannot exceed a given upper bound. In the time-dependent processing time model, the constraint is the makespan of agent B. We first show that the problem is NP-hard in the ordinary sense. Then we prove that there exists an optimal schedule which is a permutation schedule, and there exists an optimal schedule in which the adapted version of Johnson’s rule do not hold for neither agent A nor agent B. Furthermore, we show that three special cases are polynomially solvable. In the position-dependent processing time model, if the constraint is the makespan of agent B, we show that the problem is NP-hard in the ordinary sense. If the constraint is the total completion times of agent B and jobs have different release dates, the problem is strongly NP-hard.

Springer Link (Chiba Institute of Technology)
Decent work and economic growth
Openalex Percentile: Top 54%
Agriculture, Water, and Health
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.