Assessment of Project Planning Practices in Dire Dawa Administration: A comparative Study between Sample Selected Government and Non Government Construction Projects

The main objective of this study was to assess the project planning maturity level of government and Hararghe Catholic Secretariat construction projects in Dire Dawa Administration. The study applied a quantitative research approach via employing descriptive research design to quench the specific and general objectives of the study. Moreover, both primary and secondary data were gathered. The target respondents of this study were totally 312; as a result census survey method through cross-sectional method of inquiry was employed. Moreover, Descriptive statistical tools and independent sample T-test at 95% confidence level were employed as data analysis tools. The overall project planning maturity level at government large construction projects towards project scoping, project integration, project human resource planning, project procurement and project stakeholders planning is at maturity level 3. However, in project time management, project quality planning, project cost planning, project communication and project risk planning elements are not completely standardized and thus processes are not applied properly and effectively. Conversely, the majority of the ten dimensions of project planning in Hararghe Catholic Secretariat are practiced at the managed or level four statuses which indicated that the project planning dimensions are not only well standardized and institutionalized it is also well con-trolled and managed however continuous learning and improvement is still a requirement. So, government construction projects managers should give due attention on preparation of a well-defined project plan.

Publication Details

Journal
National Academic Digital Repository of Ethiopia
Published
2025-09-18
DOI
https://doi.org/10.20372/nadre:18754
Primary Topic
Geochemistry and Geologic Mapping
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Assessment of Project Planning Practices in Dire Dawa Administration: A comparative Study between Sample Selected Government and Non Government Construction Projects

National Academic Digital Repository of Ethiopia
Geochemistry and Geologic Mapping
article

Assessment of Project Planning Practices in Dire Dawa Administration: A comparative Study between Sample Selected Government and Non Government Construction Projects

article en

Abstract

The main objective of this study was to assess the project planning maturity level of government and Hararghe Catholic Secretariat construction projects in Dire Dawa Administration. The study applied a quantitative research approach via employing descriptive research design to quench the specific and general objectives of the study. Moreover, both primary and secondary data were gathered. The target respondents of this study were totally 312; as a result census survey method through cross-sectional method of inquiry was employed. Moreover, Descriptive statistical tools and independent sample T-test at 95% confidence level were employed as data analysis tools. The overall project planning maturity level at government large construction projects towards project scoping, project integration, project human resource planning, project procurement and project stakeholders planning is at maturity level 3. However, in project time management, project quality planning, project cost planning, project communication and project risk planning elements are not completely standardized and thus processes are not applied properly and effectively. Conversely, the majority of the ten dimensions of project planning in Hararghe Catholic Secretariat are practiced at the managed or level four statuses which indicated that the project planning dimensions are not only well standardized and institutionalized it is also well con-trolled and managed however continuous learning and improvement is still a requirement. So, government construction projects managers should give due attention on preparation of a well-defined project plan.

National Academic Digital Repository of Ethiopia
Decent work and economic growth
Openalex Percentile: Top 35%
Geochemistry and Geologic Mapping
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.