Financial Analysis of a Large-scale Hydropower Project in Pakistan with a Focus on Clean Energy Transition and National Priorities

This study evaluated the financial viability of a proposed 4,500 MW hydropower project in Pakistan, with a focus on alternative financing structures and sensitivity to macroeconomic and operational risks. Using the FINPLAN model and sectoral data from Pakistan’s National Electric Power Regulatory Authority (NEPRA), Independent System and Market Operator (ISMO), and International Monetary Fund (IMF), two scenarios were compared: (i) full private financing with equity and foreign loans, and (ii) partial government support through a grant covering 20% of the local currency component. Results show that while both scenarios can deliver attractive returns under favorable conditions, the project’s resilience is significantly influenced by electricity pricing, production levels, and inflation. Subsidized tariffs and reduced generation substantially erode net present value (NPV) and internal rate of return (IRR), at times making the project financially unattractive. Similarly, higher Pakistan rupee (Rs) inflation relative to the internationally dominated loan imposes additional financing needs, raising project vulnerability. Government support helps ease capital pressure and enhances resilience but cannot fully shield the project from risks of low tariffs or reduced generation. Overall, large-scale hydropower remains a crucial option for meeting Pakistan’s future electricity demand and policy targets, but its financial sustainability depends on realistic pricing, climate resilience, and stable macroeconomic conditions. This work was supported by the Climate Compatible Growth Programme (#CCG) of the UK's Foreign Development and Commonwealth Office (FCDO). The views expressed in this paper do not necessarily reflect the UK government's official policies.

Institutions

Publication Details

Journal
Zenodo (CERN European Organization for Nuclear Research)
Published
2025-09-18
DOI
https://doi.org/10.5281/zenodo.17151470
Primary Topic
Geochemistry and Geologic Mapping
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Financial Analysis of a Large-scale Hydropower Project in Pakistan with a Focus on Clean Energy Transition and National Priorities

Zenodo (CERN European Organization for Nuclear Research)
Geochemistry and Geologic Mapping
article

Financial Analysis of a Large-scale Hydropower Project in Pakistan with a Focus on Clean Energy Transition and National Priorities

article en

Abstract

This study evaluated the financial viability of a proposed 4,500 MW hydropower project in Pakistan, with a focus on alternative financing structures and sensitivity to macroeconomic and operational risks. Using the FINPLAN model and sectoral data from Pakistan’s National Electric Power Regulatory Authority (NEPRA), Independent System and Market Operator (ISMO), and International Monetary Fund (IMF), two scenarios were compared: (i) full private financing with equity and foreign loans, and (ii) partial government support through a grant covering 20% of the local currency component. Results show that while both scenarios can deliver attractive returns under favorable conditions, the project’s resilience is significantly influenced by electricity pricing, production levels, and inflation. Subsidized tariffs and reduced generation substantially erode net present value (NPV) and internal rate of return (IRR), at times making the project financially unattractive. Similarly, higher Pakistan rupee (Rs) inflation relative to the internationally dominated loan imposes additional financing needs, raising project vulnerability. Government support helps ease capital pressure and enhances resilience but cannot fully shield the project from risks of low tariffs or reduced generation. Overall, large-scale hydropower remains a crucial option for meeting Pakistan’s future electricity demand and policy targets, but its financial sustainability depends on realistic pricing, climate resilience, and stable macroeconomic conditions. This work was supported by the Climate Compatible Growth Programme (#CCG) of the UK's Foreign Development and Commonwealth Office (FCDO). The views expressed in this paper do not necessarily reflect the UK government's official policies.

Zenodo (CERN European Organization for Nuclear Research)
Institute for Systems Analysis (RU)
Openalex Percentile: Top 35%
Geochemistry and Geologic Mapping
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.