Tinjauan Pengawasan Waktu Pelaksanaan Pada Proyek Pembangunan Dinding Penahan Tanah Kejaksaan Tinggi Sumatera Selatan

This study aims to evaluate the suitability between planning and realization of implementation time in the retaining wall construction project at the South Sumatra High Prosecutor's Office. Using quantitative descriptive method and case study approach, data was obtained through direct observation, documentation, and analysis of weekly and monthly project reports. The S-curve is used as the main tool in monitoring the deviation between the planned and realized work weights. The results showed that in general the project was on schedule, although there was a negative deviation in weeks 7 to 9 due to weather constraints, material delays, and labor shortages. However, through acceleration strategies such as overtime and improved logistics management, delays were minimized. Structured time monitoring proved effective in keeping the project within schedule tolerance limits. This research emphasizes the importance of an adaptive monitoring system as well as good coordination between teams as keys to successful implementation of construction projects.

Institutions

Publication Details

Journal
STORAGE Jurnal Ilmiah Teknik dan Ilmu Komputer
Published
2025-08-31
DOI
https://doi.org/10.55123/storage.v4i3.5773
Primary Topic
Geochemistry and Geologic Mapping
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Tinjauan Pengawasan Waktu Pelaksanaan Pada Proyek Pembangunan Dinding Penahan Tanah Kejaksaan Tinggi Sumatera Selatan

STORAGE Jurnal Ilmiah Teknik dan Ilmu Komputer
Geochemistry and Geologic Mapping
article

Tinjauan Pengawasan Waktu Pelaksanaan Pada Proyek Pembangunan Dinding Penahan Tanah Kejaksaan Tinggi Sumatera Selatan

article en

Abstract

This study aims to evaluate the suitability between planning and realization of implementation time in the retaining wall construction project at the South Sumatra High Prosecutor's Office. Using quantitative descriptive method and case study approach, data was obtained through direct observation, documentation, and analysis of weekly and monthly project reports. The S-curve is used as the main tool in monitoring the deviation between the planned and realized work weights. The results showed that in general the project was on schedule, although there was a negative deviation in weeks 7 to 9 due to weather constraints, material delays, and labor shortages. However, through acceleration strategies such as overtime and improved logistics management, delays were minimized. Structured time monitoring proved effective in keeping the project within schedule tolerance limits. This research emphasizes the importance of an adaptive monitoring system as well as good coordination between teams as keys to successful implementation of construction projects.

STORAGE Jurnal Ilmiah Teknik dan Ilmu KomputerVol. 4(3)
Universitas Bina Darma (ID)
Decent work and economic growth
Openalex Percentile: Top 39%
Geochemistry and Geologic Mapping
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Tinjauan Pengawasan Waktu Pelaksanaan Pada Proyek Pembangunan Dinding Penahan Tanah Kejaksaan Tinggi Sumatera Selatan · STORAGE Jurnal Ilmiah Teknik dan Ilmu Komputer (2025) | TGRS Research Map | TGRS