Élaboration d'une Méthode d'Évaluation du Potentiel Énergétique pour les Projets de Renouvellement deParcs Éoliens

For new wind farm investments, including repowering, two key metrics are crucial: the estimated annual energy production and its associated uncertainty. Investors seek low uncertainty, which hinges on accurately estimating the uncertainty itself. This creates two research goals: 1) reducing uncertainty through improved climate and wind farm modeling—current methods still range from 6% to 12% uncertainty, and 2) refining the reliability of uncertainty models with better and faster propagation techniques. State-of-the-art EYA methods are well-accepted in the industry, but reducing uncertainty offers significant financial advantages. Repowering offers a new opportunity for EYA since it benefits from extensive historical data from the existing site, including 10-minute energy production records. This thesis aims to incorporate this data into the EYA process while to improve both accuracy and reliability. Most studies overlook uncertainty or fail to quantify improvements. This thesis proposes a method that achieves reliable AEP estimates with better uncertainty predictions.

Institutions

Publication Details

Journal
theses.fr (ABES)
Published
2025-01-22
Primary Topic
Geochemistry and Geologic Mapping
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Élaboration d'une Méthode d'Évaluation du Potentiel Énergétique pour les Projets de Renouvellement deParcs Éoliens

theses.fr (ABES)
Geochemistry and Geologic Mapping
article

Élaboration d'une Méthode d'Évaluation du Potentiel Énergétique pour les Projets de Renouvellement deParcs Éoliens

article en

Abstract

For new wind farm investments, including repowering, two key metrics are crucial: the estimated annual energy production and its associated uncertainty. Investors seek low uncertainty, which hinges on accurately estimating the uncertainty itself. This creates two research goals: 1) reducing uncertainty through improved climate and wind farm modeling—current methods still range from 6% to 12% uncertainty, and 2) refining the reliability of uncertainty models with better and faster propagation techniques. State-of-the-art EYA methods are well-accepted in the industry, but reducing uncertainty offers significant financial advantages. Repowering offers a new opportunity for EYA since it benefits from extensive historical data from the existing site, including 10-minute energy production records. This thesis aims to incorporate this data into the EYA process while to improve both accuracy and reliability. Most studies overlook uncertainty or fail to quantify improvements. This thesis proposes a method that achieves reliable AEP estimates with better uncertainty predictions.

theses.fr (ABES)
Centre Procédés, Energies Renouvelables et Systèmes Energétiques (FR)
Openalex Percentile: Top 43%
Geochemistry and Geologic Mapping
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.