Risk Analysis of Construction Delays in High-Rise Projects

Delays in construction projects remain a critical challenge in project management, often resulting in schedule deviations, cost overruns, and reduced project quality. This study investigates the primary risk factors contributing to delays in a high-rise educational building project (XYZ School) in Indonesia. Adopting a descriptive qualitative approach, data were collected through structured interviews and questionnaires with ten experienced construction professionals. The analysis utilized the Fishbone (Ishikawa) diagram to trace causal pathways and a probability–impact matrix to assess the severity and likelihood of each identified risk. Findings reveal that financial instability—particularly due to fluctuations in material prices (e.g., steel rising from IDR 8,800 to IDR 12,000/kg)—and poor cash flow management are the most critical causes of delay. Other significant risks include frequent design revisions, labor fatigue from excessive overtime, and adverse weather conditions. The study concludes with strategic recommendations to mitigate these risks, emphasizing improved financial planning, enhanced design coordination, and proactive contingency scheduling.

Institutions

Publication Details

Journal
Zenodo (CERN European Organization for Nuclear Research)
Published
2025-08-20
DOI
https://doi.org/10.5281/zenodo.17076726
Primary Topic
Geochemistry and Geologic Mapping
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Risk Analysis of Construction Delays in High-Rise Projects

Zenodo (CERN European Organization for Nuclear Research)
Geochemistry and Geologic Mapping
article

Risk Analysis of Construction Delays in High-Rise Projects

article en

Abstract

Delays in construction projects remain a critical challenge in project management, often resulting in schedule deviations, cost overruns, and reduced project quality. This study investigates the primary risk factors contributing to delays in a high-rise educational building project (XYZ School) in Indonesia. Adopting a descriptive qualitative approach, data were collected through structured interviews and questionnaires with ten experienced construction professionals. The analysis utilized the Fishbone (Ishikawa) diagram to trace causal pathways and a probability–impact matrix to assess the severity and likelihood of each identified risk. Findings reveal that financial instability—particularly due to fluctuations in material prices (e.g., steel rising from IDR 8,800 to IDR 12,000/kg)—and poor cash flow management are the most critical causes of delay. Other significant risks include frequent design revisions, labor fatigue from excessive overtime, and adverse weather conditions. The study concludes with strategic recommendations to mitigate these risks, emphasizing improved financial planning, enhanced design coordination, and proactive contingency scheduling.

Zenodo (CERN European Organization for Nuclear Research)
Bakrie University (ID)
Openalex Percentile: Top 49%
Geochemistry and Geologic Mapping
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.