Critical Delay Factors in PHJD Road Construction Project: A Case Study in North Toraja Using the Relative Importance Index (RII) Method
This study aims to analyse the critical factors causing delays in the Provincial Road Grant Program (PHJD)road construction project in North Toraja Regency, particularly on the Pangala-Baruppu-West Sulawesiroad segment, using the Relative Importance Index (RII) method. Data were collected throughquestionnaires completed by 34 respondents directly involved in the project, including contractors,supervising consultants, and other related parties. The results of the study show that the most significantcause of delays in the PHJD road construction project was material testing delays, with the highest RIIscore of 0.888. Other key contributors were material delivery issues, ineffective coordination, andunpredictable weather. Financial issues had a medium impact, while factors like low labor productivityand lack of GS responsibility were less influential. Design changes and land acquisition were the leastsignificant. The findings emphasize the need for improved coordination, efficient material handling, andbetter preparation for environmental challenges to minimize delays and enhance project performance.
Institutions
- State University of Makassar (ID)
Publication Details
- Journal
- Zenodo (CERN European Organization for Nuclear Research)
- Published
- 2025-03-10
- DOI
- https://doi.org/10.5281/zenodo.17063614
- Primary Topic
- Geochemistry and Geologic Mapping
- Type
- article
- Field-Weighted Citation Impact
- 0.00