Part-5: Development of industrial scoping contracts to operations (DISCO) for REMARIS Island

The business development of industrial scoping contracts to operations (DISCO) is structured for REMARIS Island [6] operations. Firstly, the Advanced Work Packaging (AWP) methods are deployed, which is an effective, cost saving and a new strategy for project delivery that aims maximum productivity in oil and gas sector. AWP involves the planning and execution of activities from concept through commissioning and turnover into optimal work packages aligned across project phases and stakeholders. Secondly, the Capital Management System (CMS) is also adopted, the framework for managing and controlling activities and decisions related capital projects. The CMS covers the entire project development process from business planning, through project definition and execution to operations.

Institutions

Publication Details

Journal
Zenodo (CERN European Organization for Nuclear Research)
Published
2025-03-30
DOI
https://doi.org/10.5281/zenodo.17051354
Primary Topic
Reservoir Engineering and Simulation Methods
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Part-5: Development of industrial scoping contracts to operations (DISCO) for REMARIS Island

Zenodo (CERN European Organization for Nuclear Research)
Reservoir Engineering and Simulation Methods
article

Part-5: Development of industrial scoping contracts to operations (DISCO) for REMARIS Island

article en

Abstract

The business development of industrial scoping contracts to operations (DISCO) is structured for REMARIS Island [6] operations. Firstly, the Advanced Work Packaging (AWP) methods are deployed, which is an effective, cost saving and a new strategy for project delivery that aims maximum productivity in oil and gas sector. AWP involves the planning and execution of activities from concept through commissioning and turnover into optimal work packages aligned across project phases and stakeholders. Secondly, the Capital Management System (CMS) is also adopted, the framework for managing and controlling activities and decisions related capital projects. The CMS covers the entire project development process from business planning, through project definition and execution to operations.

Zenodo (CERN European Organization for Nuclear Research)
Sinopec (China) (CN)
Industry, innovation and infrastructure
Openalex Percentile: Top 44%
Reservoir Engineering and Simulation Methods
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.