The Influence of Stakeholder Participation on the Performance of Real Estate Construction Projects in Kilimani, Nairobi City County, Kenya

This study examined the influence of stakeholder participation on the performance of real estate construction projects in Kilimani Nairobi City County, Kenya. Descriptive research design was employed in the research. The study was guided by stakeholder Theory. The target population was 480, and the sample size, 214. Questionnaires and an interview guide were used to collect quantitative data and qualitative data respectively. Statistical techniques were used to analyze quantitative data with the help of SPSS Version 25. Thematic analysis was used to analyze qualitative data. Stakeholder Participation (r = 0.539) was of great importance in improving project learning, accountability, and performance. The results reveal an overall composite mean of M = 3.17 and a standard deviation of SD = 1.22, suggesting that respondents moderately agreed that strengthening stakeholder capacity contributes to project outcomes, though perceptions varied across different aspects of participation and feedback. The results give insights to the Strong accountability mechanisms which are performance-based contracts, frequent progress updates, internal audits, and outcomes-based management which increase the authenticity. However, gaps in effectively integrating stakeholder feedback and translating participation into tangible benefits revealed the need for structured mechanisms to ensure stakeholder contributions directly enhance project performance. The study recommends that, to promote active stakeholder participation, project teams should establish clear engagement strategies throughout the project lifecycle. Structured feedback mechanisms, inclusive planning sessions, and early involvement of stakeholders can improve ownership, enhance decision-making quality, and align project outcomes with community needs. Key Words: Stakeholder, Participation, Performance, Real Estate, Construction Projects

Institutions

Publication Details

Journal
Zenodo (CERN European Organization for Nuclear Research)
Published
2025-09-04
DOI
https://doi.org/10.5281/zenodo.17051324
Primary Topic
Geochemistry and Geologic Mapping
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

The Influence of Stakeholder Participation on the Performance of Real Estate Construction Projects in Kilimani, Nairobi City County, Kenya

Zenodo (CERN European Organization for Nuclear Research)
Geochemistry and Geologic Mapping
article

The Influence of Stakeholder Participation on the Performance of Real Estate Construction Projects in Kilimani, Nairobi City County, Kenya

article en

Abstract

This study examined the influence of stakeholder participation on the performance of real estate construction projects in Kilimani Nairobi City County, Kenya. Descriptive research design was employed in the research. The study was guided by stakeholder Theory. The target population was 480, and the sample size, 214. Questionnaires and an interview guide were used to collect quantitative data and qualitative data respectively. Statistical techniques were used to analyze quantitative data with the help of SPSS Version 25. Thematic analysis was used to analyze qualitative data. Stakeholder Participation (r = 0.539) was of great importance in improving project learning, accountability, and performance. The results reveal an overall composite mean of M = 3.17 and a standard deviation of SD = 1.22, suggesting that respondents moderately agreed that strengthening stakeholder capacity contributes to project outcomes, though perceptions varied across different aspects of participation and feedback. The results give insights to the Strong accountability mechanisms which are performance-based contracts, frequent progress updates, internal audits, and outcomes-based management which increase the authenticity. However, gaps in effectively integrating stakeholder feedback and translating participation into tangible benefits revealed the need for structured mechanisms to ensure stakeholder contributions directly enhance project performance. The study recommends that, to promote active stakeholder participation, project teams should establish clear engagement strategies throughout the project lifecycle. Structured feedback mechanisms, inclusive planning sessions, and early involvement of stakeholders can improve ownership, enhance decision-making quality, and align project outcomes with community needs. Key Words: Stakeholder, Participation, Performance, Real Estate, Construction Projects

Zenodo (CERN European Organization for Nuclear Research)
Catholic University of Eastern Africa (KE)
Openalex Percentile: Top 54%
Geochemistry and Geologic Mapping
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

The Influence of Stakeholder Participation on the Performance of Real Estate Construction Projects in Kilimani, Nairobi City County, Kenya · Zenodo (CERN European Organization for Nuclear Research) (2025) | TGRS Research Map | TGRS