GREEN CAMPUS INITIATIVE: DESIGN AND DEPLOYMENT OF A 500 KW ROOFTOP SOLAR POWER SYSTEM AT KING FAISAL UNIVERSITY

The College of Engineering at King Faisal University in Al-Ahsa, Saudi Arabia, can benefit from reducing its dependence on non-renewable energy sources and transitioning to solar energy, which is a cost-effective alternative. This study explores the feasibility of installing a photovoltaic (PV) solar station on the roof of the college's building, utilizing software such as Google Earth Pro, AutoCAD, Sketch up Pro, Skeleton, and system advisor model (SAM) to analyze and design the system. With an available unshaded solar exposure area of 5,669 m2, the team chose three different types of panels with varying wattages (435, 555, and 720 W) to produce a total of 500 kWp. The results indicated that the 555 W panels were the most economical choice, generating 646.9 MWh annually at a capital cost of 1.25 million SAR. The system is expected to have a payback period of 8.2 years, with a levelized cost of energy (LCOE) of 0.143 SAR/kWh.

Institutions

Publication Details

Journal
Zenodo (CERN European Organization for Nuclear Research)
Published
2025-09-03
DOI
https://doi.org/10.5281/zenodo.17045176
Primary Topic
Geochemistry and Geologic Mapping
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

GREEN CAMPUS INITIATIVE: DESIGN AND DEPLOYMENT OF A 500 KW ROOFTOP SOLAR POWER SYSTEM AT KING FAISAL UNIVERSITY

Zenodo (CERN European Organization for Nuclear Research)
Geochemistry and Geologic Mapping
article

GREEN CAMPUS INITIATIVE: DESIGN AND DEPLOYMENT OF A 500 KW ROOFTOP SOLAR POWER SYSTEM AT KING FAISAL UNIVERSITY

article en

Abstract

The College of Engineering at King Faisal University in Al-Ahsa, Saudi Arabia, can benefit from reducing its dependence on non-renewable energy sources and transitioning to solar energy, which is a cost-effective alternative. This study explores the feasibility of installing a photovoltaic (PV) solar station on the roof of the college's building, utilizing software such as Google Earth Pro, AutoCAD, Sketch up Pro, Skeleton, and system advisor model (SAM) to analyze and design the system. With an available unshaded solar exposure area of 5,669 m2, the team chose three different types of panels with varying wattages (435, 555, and 720 W) to produce a total of 500 kWp. The results indicated that the 555 W panels were the most economical choice, generating 646.9 MWh annually at a capital cost of 1.25 million SAR. The system is expected to have a payback period of 8.2 years, with a levelized cost of energy (LCOE) of 0.143 SAR/kWh.

Zenodo (CERN European Organization for Nuclear Research)
King Faisal University (SA)
Affordable and clean energy
Openalex Percentile: Top 56%
Geochemistry and Geologic Mapping
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.