OVERBURDEN VOLUME CALCULATION USING CUT AND FILL METHOD AT RHML JOBSITE (RIUNG HARAPAN MITRA LESTARI) PT. RIUNG MITRA LESTARI, TAPIN REGENCY, SOUTH KALIMANTAN PROVINCE

Overburden is all layers of soil/rock that are above and directly cover the layer of valuable mining materials so that they need to be removed first before being able to dig up the valuable mining materials. In the process of removing overburden, its volume needs to be calculated. One method that is often used is the cut and fill calculation method. The cut and fill calculation method can be done using several software, including Surpac and Civil 3D. This study discusses the calculation of overburden volume based on data obtained from detailed topographic measurements of the situation at PT. Riung Mitra Lestari jobsite RHML located in Tapin Regency, South Kalimantan. This data consists of situation coordinate data from July 29 - August 21, 2024. The purpose of this report is to calculate overburden using Surpac and Civil 3D software. From the calculations, the overburden volume was obtained as much as 309,569 BCM in Surpac software and 310,548 BCM in Civil 3D software.

Institutions

Publication Details

Journal
Journal of Marine-Earth Science and Technology
Published
2025-03-05
DOI
https://doi.org/10.12962/j27745449.v5i3.2723
Primary Topic
Geochemistry and Geologic Mapping
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

OVERBURDEN VOLUME CALCULATION USING CUT AND FILL METHOD AT RHML JOBSITE (RIUNG HARAPAN MITRA LESTARI) PT. RIUNG MITRA LESTARI, TAPIN REGENCY, SOUTH KALIMANTAN PROVINCE

Journal of Marine-Earth Science and Technology
Geochemistry and Geologic Mapping
article

OVERBURDEN VOLUME CALCULATION USING CUT AND FILL METHOD AT RHML JOBSITE (RIUNG HARAPAN MITRA LESTARI) PT. RIUNG MITRA LESTARI, TAPIN REGENCY, SOUTH KALIMANTAN PROVINCE

article en

Abstract

Overburden is all layers of soil/rock that are above and directly cover the layer of valuable mining materials so that they need to be removed first before being able to dig up the valuable mining materials. In the process of removing overburden, its volume needs to be calculated. One method that is often used is the cut and fill calculation method. The cut and fill calculation method can be done using several software, including Surpac and Civil 3D. This study discusses the calculation of overburden volume based on data obtained from detailed topographic measurements of the situation at PT. Riung Mitra Lestari jobsite RHML located in Tapin Regency, South Kalimantan. This data consists of situation coordinate data from July 29 - August 21, 2024. The purpose of this report is to calculate overburden using Surpac and Civil 3D software. From the calculations, the overburden volume was obtained as much as 309,569 BCM in Surpac software and 310,548 BCM in Civil 3D software.

Journal of Marine-Earth Science and TechnologyVol. 5(3)
Sepuluh Nopember Institute of Technology (ID)
Decent work and economic growth
Openalex Percentile: Top 57%
Geochemistry and Geologic Mapping
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

OVERBURDEN VOLUME CALCULATION USING CUT AND FILL METHOD AT RHML JOBSITE (RIUNG HARAPAN MITRA LESTARI) PT. RIUNG MITRA LESTARI, TAPIN REGENCY, SOUTH KALIMANTAN PROVINCE · Journal of Marine-Earth Science and Technology (2025) | TGRS Research Map | TGRS