Wrongly Allocated Emission Permits in Korea

This paper analyzes an administrative litigation case concerning South Korea’s Greenhouse Gas Emissions Trading System (ETS). The Korean government operates the ETS to achieve its carbon neutrality goals, but legal disputes have arisen over the fairness and accuracy of emissions permit allocation. The case study focuses on the cement industry, where one manufacturer (Company A) intentionally inflated its past greenhouse gas emissions to receive a larger allocation of permits. This prompted the other six cement manufacturers to file a lawsuit, which has proceeded through three rounds of litigation. In the first lawsuit, the court held that Company A’s emissions calculation was unlawful. However, the government’s subsequent retroactive revision of its guidelines led to a second lawsuit, which the government also lost. The ongoing third lawsuit centers on the calculation method for “estimated emissions” when historical data is absent. This case illustrates how technical details in the allocation process can undermine the credibility of the entire system, highlighting that its success or failure ultimately hinges on such details.

Publication Details

Journal
Korea Europe Review
Published
2025-08-30
DOI
https://doi.org/10.48770/ker.2025.no8.63
Primary Topic
Geochemistry and Geologic Mapping
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Wrongly Allocated Emission Permits in Korea

Korea Europe Review
Geochemistry and Geologic Mapping
article

Wrongly Allocated Emission Permits in Korea

article en

Abstract

This paper analyzes an administrative litigation case concerning South Korea’s Greenhouse Gas Emissions Trading System (ETS). The Korean government operates the ETS to achieve its carbon neutrality goals, but legal disputes have arisen over the fairness and accuracy of emissions permit allocation. The case study focuses on the cement industry, where one manufacturer (Company A) intentionally inflated its past greenhouse gas emissions to receive a larger allocation of permits. This prompted the other six cement manufacturers to file a lawsuit, which has proceeded through three rounds of litigation. In the first lawsuit, the court held that Company A’s emissions calculation was unlawful. However, the government’s subsequent retroactive revision of its guidelines led to a second lawsuit, which the government also lost. The ongoing third lawsuit centers on the calculation method for “estimated emissions” when historical data is absent. This case illustrates how technical details in the allocation process can undermine the credibility of the entire system, highlighting that its success or failure ultimately hinges on such details.

Korea Europe Review
Openalex Percentile: Top 58%
Geochemistry and Geologic Mapping
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.