Improving Infrastructure Performance Using BIM (Building Information Modelling): Experimental Study of Cost Reduction in Road Planning

The productivity of the construction sector still needs to be increased by choosing effective methods. Manual method (2D) road planning takes a long time and results are less accurate. BIM (Building Information Modelling) as a new method needs to be proven for use in road planning projects. In this study, the BIM method was applied to the case study of the new road planning of Kretek-Girijati using Autocad Civil 3D software. Planning includes vertical alignment and horizontal alignment with the 2021 Geometric Road Guidelines standards. Furthermore, the volume of excavation and landfill will emerge from the model and the total cost will be known after multiplying the unit price. Some planning alternatives use BIM models compared to the initial design. There are 3 alternative designs made, featuring a shorter road trace length, more sloping, less excavation volume and pile than existing routes. The cost of the existing design is IDR 28,920,870,000.00, the most economical cost in Alternative 3 is IDR 15,697,819,300.00 with the difference in the cost of both IDR 13,223,045,900.00. It was concluded that Alternative 3 is the most economical in terms of earthworks compared to other alternatives and existing designs. These findings provide a reinforcement to use BIM methods at the road design stage.

Publication Details

Journal
Springer Link (Chiba Institute of Technology)
Published
2025-08-28
DOI
https://doi.org/10.1051/e3sconf/202564502004/pdf
Primary Topic
Cell Image Analysis Techniques
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Improving Infrastructure Performance Using BIM (Building Information Modelling): Experimental Study of Cost Reduction in Road Planning

Springer Link (Chiba Institute of Technology)
Cell Image Analysis Techniques
article

Improving Infrastructure Performance Using BIM (Building Information Modelling): Experimental Study of Cost Reduction in Road Planning

article en

Abstract

The productivity of the construction sector still needs to be increased by choosing effective methods. Manual method (2D) road planning takes a long time and results are less accurate. BIM (Building Information Modelling) as a new method needs to be proven for use in road planning projects. In this study, the BIM method was applied to the case study of the new road planning of Kretek-Girijati using Autocad Civil 3D software. Planning includes vertical alignment and horizontal alignment with the 2021 Geometric Road Guidelines standards. Furthermore, the volume of excavation and landfill will emerge from the model and the total cost will be known after multiplying the unit price. Some planning alternatives use BIM models compared to the initial design. There are 3 alternative designs made, featuring a shorter road trace length, more sloping, less excavation volume and pile than existing routes. The cost of the existing design is IDR 28,920,870,000.00, the most economical cost in Alternative 3 is IDR 15,697,819,300.00 with the difference in the cost of both IDR 13,223,045,900.00. It was concluded that Alternative 3 is the most economical in terms of earthworks compared to other alternatives and existing designs. These findings provide a reinforcement to use BIM methods at the road design stage.

Springer Link (Chiba Institute of Technology)
Industry, innovation and infrastructure
Openalex Percentile: Top 40%
Cell Image Analysis Techniques
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Improving Infrastructure Performance Using BIM (Building Information Modelling): Experimental Study of Cost Reduction in Road Planning · Springer Link (Chiba Institute of Technology) (2025) | TGRS Research Map | TGRS