D3.9 Installation strategies of the electrical storage system
This deliverable was prepared in the context of Task 3.5 “Engineering, installation strategies and prototyping for electrical storage”; previously to this deliverable it was prepared the D3.8 related to the “Design of the Electrical Storage System” as part of the same task. The present D3.9 is focused on the installation strategies of the Electrical Storage System (ESS) that use Li-ion battery modules, with LFP technology, compatible with hybrid inverters. These strategies can be applied in implementations, where the MiniStor system will be installed; they consider the design performed for the related demo sites (Thessaloniki, Sopron, Cork and Santiago (USC)), as well as the feedback from these demonstration sites. The strategies include the initial works for ESS installation, the electrical connection strategies, the communication connection strategies, the regulation strategies for the ESS and complementary information required for the installation process.
Institutions
- Endo Pharmaceuticals (United States) (US)
- Fundación Prodintec (ES)
- Central Arkansas Radiation Therapy Institute (US)
Publication Details
- Journal
- Zenodo (CERN European Organization for Nuclear Research)
- Published
- 2025-06-20
- DOI
- https://doi.org/10.5281/zenodo.16979014
- Primary Topic
- Geochemistry and Geologic Mapping
- Type
- article
- Field-Weighted Citation Impact
- 0.00