The Paris agreement made Indonesia committed to the renewable energy transition. This commitment encourages Indonesia and PLN to make RUPTL which increases the potential for hydropower in Indonesia. This increased potential has attracted investors to invest in the MHP business. However, the MHP business still has risks that make costs fluctuate, disrupting prospects and causing doubts in investment. To overcome this problem, the authors created a financial projection model using a discounted cash flow model with a risk approach using the value at risk monte carlo method so that it can measure MHP valuations more accurately and can provide investment feasibility considerations. This study examines the financial viability of Mini Hydro Power Plant (PLTM) investments in Indonesia, where renewable energy development faces risks from fluctuating costs and uncertain returns. The research aims to evaluate PLTM project risks using the Value at Risk (VaR) method combined with Monte Carlo simulation, focusing on three key variables: loss factor (7%), operational costs, and water retribution fees. Financial data from a West Sumatran PLTM company was analyzed through discounted cash flow (DCF) modeling with a 3% discount rate, supplemented by 10,000-iteration Monte Carlo simulations at 95% confidence levels. Results indicate positive NPV values under normal conditions (Rp161.6 billion), demonstrating investment feasibility, while sensitivity analysis shows potential 8-22% valuation improvements with reduced loss factors. The study provides investors with a risk-assessment framework and suggests infrastructure optimization could enhance PLTM profitability.

Institutions

Publication Details

Journal
Indonesian Journal of Multidisciplinary Science
Published
2025-07-30
DOI
https://doi.org/10.55324/ijoms.v4i10.1166
Primary Topic
Geochemistry and Geologic Mapping
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Valuation Analysis of Mini Hydro Power Plant Using Value at Risk Method

Indonesian Journal of Multidisciplinary Science
Geochemistry and Geologic Mapping
article

Valuation Analysis of Mini Hydro Power Plant Using Value at Risk Method

article en

Abstract

The Paris agreement made Indonesia committed to the renewable energy transition. This commitment encourages Indonesia and PLN to make RUPTL which increases the potential for hydropower in Indonesia. This increased potential has attracted investors to invest in the MHP business. However, the MHP business still has risks that make costs fluctuate, disrupting prospects and causing doubts in investment. To overcome this problem, the authors created a financial projection model using a discounted cash flow model with a risk approach using the value at risk monte carlo method so that it can measure MHP valuations more accurately and can provide investment feasibility considerations. This study examines the financial viability of Mini Hydro Power Plant (PLTM) investments in Indonesia, where renewable energy development faces risks from fluctuating costs and uncertain returns. The research aims to evaluate PLTM project risks using the Value at Risk (VaR) method combined with Monte Carlo simulation, focusing on three key variables: loss factor (7%), operational costs, and water retribution fees. Financial data from a West Sumatran PLTM company was analyzed through discounted cash flow (DCF) modeling with a 3% discount rate, supplemented by 10,000-iteration Monte Carlo simulations at 95% confidence levels. Results indicate positive NPV values under normal conditions (Rp161.6 billion), demonstrating investment feasibility, while sensitivity analysis shows potential 8-22% valuation improvements with reduced loss factors. The study provides investors with a risk-assessment framework and suggests infrastructure optimization could enhance PLTM profitability.

Indonesian Journal of Multidisciplinary ScienceVol. 4(10)
University of Indonesia (ID)
Industry, innovation and infrastructure
Openalex Percentile: Top 69%
Geochemistry and Geologic Mapping
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Valuation Analysis of Mini Hydro Power Plant Using Value at Risk Method · Indonesian Journal of Multidisciplinary Science (2025) | TGRS Research Map | TGRS