Method for determining the installation interval of vortexing cuttings removal tool and its mechanism

Recent advancements in drilling technology have driven substantial progress in cuttings removal tool development, particularly for addressing borehole cleaning challenges in highly deviated directional critical factors in operational safety and efficiency improvement. Despite these innovations, two fundamental challenges persist: an incomplete understanding of mechanistic cuttings removal processes and an insufficient methodological framework for optimal tool installation. Studying the installation positions and assessing the effects of two cuttings removal are essential steps to advance the application of such tools. This investigation was initiated with a comprehensive analysis of particle settling dynamics and migration behaviors in annular wellbore spaces. Building upon Moore's terminal settling velocity equation, a modified model was developed to characterize the transport patterns of cuttings. Through model integration, the precise positioning of the efficient Vortex Cuttings Removal Tool (VCRT) was determined at 188 m from the bit. Subsequently, Computational Fluid Dynamics (CFD) numerical simulation was employed to reveal distinct annular flow field characteristics between VCRT and conventional drilling tools. Field validation in Well Z401X demonstrated a strong correlation between empirical measurements and simulated predictions, with pressure drop deviations of 6.25% and rotational speed variances limited to 7.50%. Analytical results confirmed VCRT's superior performance, exhibited 36.43% reductions in cuttings accumulation at the wellbore's lower quadrant compared to conventional drilling tools. The application of VCRT accelerated cuttings migration velocity in the annular space, significantly increasing the volume of returned onsite cuttings. Friction resistance decreased by approximately 35.90%, indicating higher cuttings removal efficiency than conventional drilling tools.

Institutions

Publication Details

Journal
Petroleum Science
Published
2025-08-14
DOI
https://doi.org/10.1016/j.petsci.2025.08.016
Primary Topic
Geochemistry and Geologic Mapping
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Method for determining the installation interval of vortexing cuttings removal tool and its mechanism

Petroleum Science
Geochemistry and Geologic Mapping
article

Method for determining the installation interval of vortexing cuttings removal tool and its mechanism

article en

Abstract

Recent advancements in drilling technology have driven substantial progress in cuttings removal tool development, particularly for addressing borehole cleaning challenges in highly deviated directional critical factors in operational safety and efficiency improvement. Despite these innovations, two fundamental challenges persist: an incomplete understanding of mechanistic cuttings removal processes and an insufficient methodological framework for optimal tool installation. Studying the installation positions and assessing the effects of two cuttings removal are essential steps to advance the application of such tools. This investigation was initiated with a comprehensive analysis of particle settling dynamics and migration behaviors in annular wellbore spaces. Building upon Moore's terminal settling velocity equation, a modified model was developed to characterize the transport patterns of cuttings. Through model integration, the precise positioning of the efficient Vortex Cuttings Removal Tool (VCRT) was determined at 188 m from the bit. Subsequently, Computational Fluid Dynamics (CFD) numerical simulation was employed to reveal distinct annular flow field characteristics between VCRT and conventional drilling tools. Field validation in Well Z401X demonstrated a strong correlation between empirical measurements and simulated predictions, with pressure drop deviations of 6.25% and rotational speed variances limited to 7.50%. Analytical results confirmed VCRT's superior performance, exhibited 36.43% reductions in cuttings accumulation at the wellbore's lower quadrant compared to conventional drilling tools. The application of VCRT accelerated cuttings migration velocity in the annular space, significantly increasing the volume of returned onsite cuttings. Friction resistance decreased by approximately 35.90%, indicating higher cuttings removal efficiency than conventional drilling tools.

Petroleum ScienceVol. 22(9)
Sinopec (China) (CN), Shanghai University (CN)
Openalex Percentile: Top 69%
Geochemistry and Geologic Mapping
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Method for determining the installation interval of vortexing cuttings removal tool and its mechanism · Petroleum Science (2025) | TGRS Research Map | TGRS