PPP Comparative Study based on Type, Terminology, and Model Adaptation

Public-private partnerships (PPPs) have emerged as a crucial mechanism for infrastructure development, particularly in nations facing fiscal constraints and technical limitations. This study conducts a comparative analysis of PPP projects globally, focusing on three critical aspects: types of models, adaptability of models, and the terminology used. Various countries define and implement PPP differently, influenced by their legal frameworks, economic conditions, and project-specific needs. The study aims to identify the different characteristics of the PPP model, the highly adaptive model, and the various terminologies used for PPP. The research identifies a formula for determining PPP models based on asset involvement, partner participation, and payment mechanisms. Findings reveal that greater private sector involvement correlates with higher PPP adaptability models, such as Build-Operate-Transfer (BOT) and Design-Build-Finance-Operate-Maintain (DBFOM) are among the most widely adopted. Additionally, the study highlights the inconsistencies in PPP terminology across different jurisdictions, underscoring the need for a globally unified framework to enhance efficiency and cross-border collaboration, reinforcing the necessity for standardized policies to streamline global PPP implementation.

Institutions

Publication Details

Journal
Zenodo (CERN European Organization for Nuclear Research)
Published
2025-08-16
DOI
https://doi.org/10.5281/zenodo.16908398
Primary Topic
Geochemistry and Geologic Mapping
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

PPP Comparative Study based on Type, Terminology, and Model Adaptation

Zenodo (CERN European Organization for Nuclear Research)
Geochemistry and Geologic Mapping
article

PPP Comparative Study based on Type, Terminology, and Model Adaptation

article en

Abstract

Public-private partnerships (PPPs) have emerged as a crucial mechanism for infrastructure development, particularly in nations facing fiscal constraints and technical limitations. This study conducts a comparative analysis of PPP projects globally, focusing on three critical aspects: types of models, adaptability of models, and the terminology used. Various countries define and implement PPP differently, influenced by their legal frameworks, economic conditions, and project-specific needs. The study aims to identify the different characteristics of the PPP model, the highly adaptive model, and the various terminologies used for PPP. The research identifies a formula for determining PPP models based on asset involvement, partner participation, and payment mechanisms. Findings reveal that greater private sector involvement correlates with higher PPP adaptability models, such as Build-Operate-Transfer (BOT) and Design-Build-Finance-Operate-Maintain (DBFOM) are among the most widely adopted. Additionally, the study highlights the inconsistencies in PPP terminology across different jurisdictions, underscoring the need for a globally unified framework to enhance efficiency and cross-border collaboration, reinforcing the necessity for standardized policies to streamline global PPP implementation.

Zenodo (CERN European Organization for Nuclear Research)
Babasaheb Bhimrao Ambedkar University (IN)
Partnerships for the goals
Openalex Percentile: Top 70%
Geochemistry and Geologic Mapping
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.