An Advanced Reactive Approach to Solve Extended Resource-Constrained Project Scheduling Problems

This paper introduces a fast and configurable method for solving resource-constrained multi-project scheduling problems, using a multi-aspect decision-making procedure that combines a schedule generation scheme with various task-selection values and priorities. The goal of fast scheduling generation is to support reactive scheduling environments. During calculation each decision aspect is computed to produce numerical values, reflecting the importance of each aspect for candidate selection. These priorities can be tailored to specific optimization objectives. The priorities can be customized according to the objective of the optimization problem. The method was tested on the PSPLIB RCPSP J30 benchmark series to minimize project completion time using eight decision aspects. The average relative deviation from lower bounds was used to evaluate the impact of different decision aspect priorities. Although the focus was not on determining optimal priority values, the study explores the effectiveness of using multiple priority rules simultaneously in a configurable way in reactive scheduling environment. Performance tests confirm that the proposed method is flexible, robust, fast, and effective in solving the examined problem type.

Publication Details

Journal
Repository of the Academy's Library (Library of the Hungarian Academy of Sciences)
Published
2025-01-01
Primary Topic
Diverse Scientific and Economic Studies
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

An Advanced Reactive Approach to Solve Extended Resource-Constrained Project Scheduling Problems

Repository of the Academy's Library (Library of the Hungarian Academy of Sciences)
Diverse Scientific and Economic Studies
article

An Advanced Reactive Approach to Solve Extended Resource-Constrained Project Scheduling Problems

article en

Abstract

This paper introduces a fast and configurable method for solving resource-constrained multi-project scheduling problems, using a multi-aspect decision-making procedure that combines a schedule generation scheme with various task-selection values and priorities. The goal of fast scheduling generation is to support reactive scheduling environments. During calculation each decision aspect is computed to produce numerical values, reflecting the importance of each aspect for candidate selection. These priorities can be tailored to specific optimization objectives. The priorities can be customized according to the objective of the optimization problem. The method was tested on the PSPLIB RCPSP J30 benchmark series to minimize project completion time using eight decision aspects. The average relative deviation from lower bounds was used to evaluate the impact of different decision aspect priorities. Although the focus was not on determining optimal priority values, the study explores the effectiveness of using multiple priority rules simultaneously in a configurable way in reactive scheduling environment. Performance tests confirm that the proposed method is flexible, robust, fast, and effective in solving the examined problem type.

Repository of the Academy's Library (Library of the Hungarian Academy of Sciences)
Openalex Percentile: Top 37%
Diverse Scientific and Economic Studies
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.