The Path of Systematic Improvement of the Rules for Ships Under Construction in Maritime Law of the People's Republic of China

Maritime Law of the People's Republic of China has not established a system of rules for ships under construction, leading to disputes in practice such as whether relevant parties of ships under construction can apply for the limitation of liability for maritime claims, and whether the rules in relation to maritime liens and the marine insurance contract can be applied. The root of the such disputes lies in the fact that the current Chinese Maritime Code is absent on the legal status of ships under construction. Through the analysis of the theoretical basis, comparative reference and demarcation standards, the phased application approach can be deployed to solve the disputes concerning ships under construction. It is proposed to adopt a systematic perspective to clarify the phased application approach during the revision of the Chinese Maritime Code. Specifically, it is recommended that ships under construction after launching to be included in the scope of ships, so as to realize the phased application approach of the Chinese Maritime Code to ships under construction and to improve the rule system for ships under construction.

Institutions

Publication Details

Journal
SHILAP Revista de lepidopterología
Published
2024-09-01
Primary Topic
Nuclear Structure and Function
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

The Path of Systematic Improvement of the Rules for Ships Under Construction in Maritime Law of the People's Republic of China

SHILAP Revista de lepidopterología
Nuclear Structure and Function
article

The Path of Systematic Improvement of the Rules for Ships Under Construction in Maritime Law of the People's Republic of China

article en

Abstract

Maritime Law of the People's Republic of China has not established a system of rules for ships under construction, leading to disputes in practice such as whether relevant parties of ships under construction can apply for the limitation of liability for maritime claims, and whether the rules in relation to maritime liens and the marine insurance contract can be applied. The root of the such disputes lies in the fact that the current Chinese Maritime Code is absent on the legal status of ships under construction. Through the analysis of the theoretical basis, comparative reference and demarcation standards, the phased application approach can be deployed to solve the disputes concerning ships under construction. It is proposed to adopt a systematic perspective to clarify the phased application approach during the revision of the Chinese Maritime Code. Specifically, it is recommended that ships under construction after launching to be included in the scope of ships, so as to realize the phased application approach of the Chinese Maritime Code to ships under construction and to improve the rule system for ships under construction.

SHILAP Revista de lepidopterología
Dalian Maritime University (CN)
Peace, Justice and strong institutions
Openalex Percentile: Top 49%
Nuclear Structure and Function
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

The Path of Systematic Improvement of the Rules for Ships Under Construction in Maritime Law of the People's Republic of China · SHILAP Revista de lepidopterología (2024) | TGRS Research Map | TGRS