Nested Monte-Carlo Search for Scheduling an Automated Guided Vehicle in a Blocking Job-Shop

We consider a job-shop scheduling problem where a single automated guided vehicle (AGV) transports jobs between workstations. There are multiple but few job types, each with a specific path through the workstations and a specific processing time per workstation. The AGV can transport one job at a time, and there are no buffers, meaning each workstation must be empty before the AGV can deliver a new job. The goal is to schedule the AGV to minimize the makespan, which is the time when the last job is processed. We provide an Integer Linear Programming (ILP) formulation to find an optimal solution, and observe that within few minutes it can only solve small instances. As a remedy, we design a heuristic algorithm using the Nested Monte-Carlo Search (NMCS) paradigm. We compare its performance with two greedy algorithms and a local search approach. In the experiments, the NMCS-heuristic significantly outperforms traditional ILP methods and greedy algorithms under limited time resources.

Publication Details

Journal
Research Publications (Maastricht University)
Published
2024-11-18
Primary Topic
Diverse Scientific and Economic Studies
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Nested Monte-Carlo Search for Scheduling an Automated Guided Vehicle in a Blocking Job-Shop

Research Publications (Maastricht University)
Diverse Scientific and Economic Studies
article

Nested Monte-Carlo Search for Scheduling an Automated Guided Vehicle in a Blocking Job-Shop

article en

Abstract

We consider a job-shop scheduling problem where a single automated guided vehicle (AGV) transports jobs between workstations. There are multiple but few job types, each with a specific path through the workstations and a specific processing time per workstation. The AGV can transport one job at a time, and there are no buffers, meaning each workstation must be empty before the AGV can deliver a new job. The goal is to schedule the AGV to minimize the makespan, which is the time when the last job is processed. We provide an Integer Linear Programming (ILP) formulation to find an optimal solution, and observe that within few minutes it can only solve small instances. As a remedy, we design a heuristic algorithm using the Nested Monte-Carlo Search (NMCS) paradigm. We compare its performance with two greedy algorithms and a local search approach. In the experiments, the NMCS-heuristic significantly outperforms traditional ILP methods and greedy algorithms under limited time resources.

Research Publications (Maastricht University)
Decent work and economic growth
Openalex Percentile: Top 28%
Diverse Scientific and Economic Studies
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Nested Monte-Carlo Search for Scheduling an Automated Guided Vehicle in a Blocking Job-Shop · Research Publications (Maastricht University) (2024) | TGRS Research Map | TGRS