Future outlook of Swedish hydropower capability to provide flexibility services with a 15 minute trade and settlement period

This thesis evaluates the future outlook of Swedish hydropower’s capability to provide flexibility services, particularly mFRR, under changing market conditions. Hydropower has over the years emerged as an important flexibility provider but new market changes have raised concerns. The market change includes that the Imbalance Settlement Period (ISP) and Market Time Unit (MTU) have been changed from 60 to 15 minutes on mFRR-EAM as well as the implementation of an Activation Optimisation Function (AOF). This thesis therefore investigates how the market change and an intermittent operating pattern (including more start and stop cycles, ramping events and operation outside the optimal operating range) affects hydropower production, BSPs (Balance Service Providers) and BRPs (Balance Responsible Parties). The findings show that the market change affects several aspects of hydropower which have been categorised as technical, market, hydrological and operational. In some cases, the affected aspects are driven by short-term regulation itself, while the market change can amplify the negative consequences. In other cases, the market change introduces new implications. One implication of the market change and intermittent operation is its impact on the local environment and communities. Another aspect is the wear and degradation the intermittent operation causes. By calculations of the related average and marginal cost, indications of how the degradation caused by intermittent operations can be priced in mFRR-EAM are given. However, as intermittent operation of hydropower units significantly shortens the rehabilitation interval, it increases the demand for internal and external resources and can lead to loss of income during standstill. A more intermittent operating pattern followed by the market change also affects the operational aspects as it requires more up- and downregulations of the unit’s production. This, along with a potentially higher financial risk due to higher imbalance prices followed by the market change, affects the capability of providing mFRR services. The question is how hydropower producers should and can act upon the market change or whether it may become necessary to withdraw capacity from the mFRR market.

Publication Details

Journal
KTH Publication Database DiVA (KTH Royal Institute of Technology)
Published
2025-01-01
Primary Topic
Electric Power System Optimization
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Future outlook of Swedish hydropower capability to provide flexibility services with a 15 minute trade and settlement period

KTH Publication Database DiVA (KTH Royal Institute of Technology)
Electric Power System Optimization
article

Future outlook of Swedish hydropower capability to provide flexibility services with a 15 minute trade and settlement period

article en

Abstract

This thesis evaluates the future outlook of Swedish hydropower’s capability to provide flexibility services, particularly mFRR, under changing market conditions. Hydropower has over the years emerged as an important flexibility provider but new market changes have raised concerns. The market change includes that the Imbalance Settlement Period (ISP) and Market Time Unit (MTU) have been changed from 60 to 15 minutes on mFRR-EAM as well as the implementation of an Activation Optimisation Function (AOF). This thesis therefore investigates how the market change and an intermittent operating pattern (including more start and stop cycles, ramping events and operation outside the optimal operating range) affects hydropower production, BSPs (Balance Service Providers) and BRPs (Balance Responsible Parties). The findings show that the market change affects several aspects of hydropower which have been categorised as technical, market, hydrological and operational. In some cases, the affected aspects are driven by short-term regulation itself, while the market change can amplify the negative consequences. In other cases, the market change introduces new implications. One implication of the market change and intermittent operation is its impact on the local environment and communities. Another aspect is the wear and degradation the intermittent operation causes. By calculations of the related average and marginal cost, indications of how the degradation caused by intermittent operations can be priced in mFRR-EAM are given. However, as intermittent operation of hydropower units significantly shortens the rehabilitation interval, it increases the demand for internal and external resources and can lead to loss of income during standstill. A more intermittent operating pattern followed by the market change also affects the operational aspects as it requires more up- and downregulations of the unit’s production. This, along with a potentially higher financial risk due to higher imbalance prices followed by the market change, affects the capability of providing mFRR services. The question is how hydropower producers should and can act upon the market change or whether it may become necessary to withdraw capacity from the mFRR market.

KTH Publication Database DiVA (KTH Royal Institute of Technology)
Openalex Percentile: Top 50%
Electric Power System Optimization
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Future outlook of Swedish hydropower capability to provide flexibility services with a 15 minute trade and settlement period · KTH Publication Database DiVA (KTH Royal Institute of Technology) (2025) | TGRS Research Map | TGRS