BIM-based Optimization of Placing Sequencing of A Concrete Gravity Dam

The construction of concrete gravity dams is subject to various factors, of which the rational arrangement of the placing face significantly impacts the total duration. To seek an ideal duration under a variety of limitations, the BIM technology and Shell's sort are jointly applied in the visual simulation of the dam placement plan. A dam BIM model is built and stratified. The stratified dam block sequences are taken as the variable, and the placing intensity, vertical placing interval time, transverse placing interval time, maximum adjacent height difference, and flood control rule as constraints. The Shell's sort is then applied to find the optimal solution of the placing scheme under those constraints, a computer program was developed by the Revit API interface based on .Net framework and C# language. The visual simulation of the concrete-placement optimization sequencing process was achieved. According to the engineering application, the program can quickly obtain the optimal placing sequencing and total duration under different constraints. The finding is of great significance in guiding the mechanical equipment and can be applied to similar projects.

Publication Details

Journal
SHILAP Revista de lepidopterología
Published
2024-10-01
Primary Topic
Magnetic confinement fusion research
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

BIM-based Optimization of Placing Sequencing of A Concrete Gravity Dam

SHILAP Revista de lepidopterología
Magnetic confinement fusion research
article

BIM-based Optimization of Placing Sequencing of A Concrete Gravity Dam

article en

Abstract

The construction of concrete gravity dams is subject to various factors, of which the rational arrangement of the placing face significantly impacts the total duration. To seek an ideal duration under a variety of limitations, the BIM technology and Shell's sort are jointly applied in the visual simulation of the dam placement plan. A dam BIM model is built and stratified. The stratified dam block sequences are taken as the variable, and the placing intensity, vertical placing interval time, transverse placing interval time, maximum adjacent height difference, and flood control rule as constraints. The Shell's sort is then applied to find the optimal solution of the placing scheme under those constraints, a computer program was developed by the Revit API interface based on .Net framework and C# language. The visual simulation of the concrete-placement optimization sequencing process was achieved. According to the engineering application, the program can quickly obtain the optimal placing sequencing and total duration under different constraints. The finding is of great significance in guiding the mechanical equipment and can be applied to similar projects.

SHILAP Revista de lepidopterología
Sustainable cities and communities
Openalex Percentile: Top 59%
Magnetic confinement fusion research
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.