ASCC OWL Electrical Power Shutdown Notification, Oct. 11-15, 2024

The ASCC Offshore Wind Laboratory (OWL) will require an electrical power shutdown in order to relocate the existing transformer and switch to allow for the construction of the new Green Energy & Materials Factory of the Future.

Publication Details

Journal
DigitalCommons (California Polytechnic State University)
Published
2024-10-10
Primary Topic
Advanced Frequency and Time Standards
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

ASCC OWL Electrical Power Shutdown Notification, Oct. 11-15, 2024

DigitalCommons (California Polytechnic State University)
Advanced Frequency and Time Standards
article

ASCC OWL Electrical Power Shutdown Notification, Oct. 11-15, 2024

article en

Abstract

The ASCC Offshore Wind Laboratory (OWL) will require an electrical power shutdown in order to relocate the existing transformer and switch to allow for the construction of the new Green Energy & Materials Factory of the Future.

DigitalCommons (California Polytechnic State University)
Affordable and clean energy
Openalex Percentile: Top 58%
Advanced Frequency and Time Standards
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

ASCC OWL Electrical Power Shutdown Notification, Oct. 11-15, 2024 · DigitalCommons (California Polytechnic State University) (2024) | TGRS Research Map | TGRS