Multi-Item Flow Shop Batch Scheduling with Two Stages Dedicated Machines to Minimize Total Actual Flow Time

A cigar manufacturing company produces two products using both shared and specialized machinery. There are 14 production stages, featuring distinct machines in Stage 2 and Stage 4. The company currently lacks a schedule, resulting in requests being fulfilled beyond the deadline. To address this issue, we developed a batch scheduling model for the flow shop, which prioritizes dedicated machines to reduce Total Actual Flow Time (TAFT). We selected the TAFT performance criteria to ensure timely completion and delivery of all orders, taking into account the maturity date. By implementing this model, the company aims to streamline operations, improve efficiency, and ultimately enhance customer satisfaction through the timely fulfillment of requests. The developed model integrates with an algorithm to address current challenges. The calculations conducted indicate that the developed model is capable of addressing batch scheduling issues for multi-stage processes with a focus on minimizing TAFT. We conducted tests on the proposed model, varying the common due dates for scenario 1 and the unit counts for scenario 2. The test results indicated that a type of product does not need to be scheduled sequentially, allowing for the ordering to be alternated with other types of products. Additionally, the batch size produced is not required to be uniform across all existing batches.

Publication Details

Journal
International Journal of Sustainable Construction Engineering and Technology (Universiti Tun Hussein Onn Malaysia)
Published
2025-04-30
Primary Topic
Advanced X-ray and CT Imaging
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Multi-Item Flow Shop Batch Scheduling with Two Stages Dedicated Machines to Minimize Total Actual Flow Time

International Journal of Sustainable Construction Engineering and Technology (Universiti Tun Hussein Onn Malaysia)
Advanced X-ray and CT Imaging
article

Multi-Item Flow Shop Batch Scheduling with Two Stages Dedicated Machines to Minimize Total Actual Flow Time

article en

Abstract

A cigar manufacturing company produces two products using both shared and specialized machinery. There are 14 production stages, featuring distinct machines in Stage 2 and Stage 4. The company currently lacks a schedule, resulting in requests being fulfilled beyond the deadline. To address this issue, we developed a batch scheduling model for the flow shop, which prioritizes dedicated machines to reduce Total Actual Flow Time (TAFT). We selected the TAFT performance criteria to ensure timely completion and delivery of all orders, taking into account the maturity date. By implementing this model, the company aims to streamline operations, improve efficiency, and ultimately enhance customer satisfaction through the timely fulfillment of requests. The developed model integrates with an algorithm to address current challenges. The calculations conducted indicate that the developed model is capable of addressing batch scheduling issues for multi-stage processes with a focus on minimizing TAFT. We conducted tests on the proposed model, varying the common due dates for scenario 1 and the unit counts for scenario 2. The test results indicated that a type of product does not need to be scheduled sequentially, allowing for the ordering to be alternated with other types of products. Additionally, the batch size produced is not required to be uniform across all existing batches.

International Journal of Sustainable Construction Engineering and Technology (Universiti Tun Hussein Onn Malaysia)
Industry, innovation and infrastructure
Openalex Percentile: Top 52%
Advanced X-ray and CT Imaging
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.