Facilities Reinvestment Plan Proposal

Eastern Illinois University’s strategic plan, Plan 2028, emphasizes the importance of comprehensive campus-wide facilities and capital planning under its “Create” theme. This facilities reinvestment plan aims to foster opportunities for improving university facilities and grounds. The last EIU campus Master Plan was commissioned in 2010. Over the past 15 years, EIU has experienced significant changes in its student and employee demographics, population and space utilization. However, minimal updates have been made to the campus facilities and landscape during this time. This facilities reinvestment proposal and the research conducted were created to address current needs and goals in the EIU strategic plan. EIU’s campus spans 320 acres and includes 88 buildings, totaling approximately 3.5 million gross square feet. The average building age is 56 years, with the oldest being Old Main (the Livingston C. Lord Administration Building), built in 1899, and the newest being the Renewable Energy Center, built in 2011. The Integrated Science building, currently in the planning phase, is anticipated to open in 2028. Many of the facilities were constructed during the post-war college boom of the 1960s and 1970s. As the campus continues to age, it is imperative to assess how we can remain responsible stewards of our facilities and resources to support the needs of our students and employees.

Publication Details

Journal
The Keep (Eastern Illinois University)
Published
2025-02-07
Primary Topic
Superconducting and THz Device Technology
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Facilities Reinvestment Plan Proposal

The Keep (Eastern Illinois University)
Superconducting and THz Device Technology
article

Facilities Reinvestment Plan Proposal

article en

Abstract

Eastern Illinois University’s strategic plan, Plan 2028, emphasizes the importance of comprehensive campus-wide facilities and capital planning under its “Create” theme. This facilities reinvestment plan aims to foster opportunities for improving university facilities and grounds. The last EIU campus Master Plan was commissioned in 2010. Over the past 15 years, EIU has experienced significant changes in its student and employee demographics, population and space utilization. However, minimal updates have been made to the campus facilities and landscape during this time. This facilities reinvestment proposal and the research conducted were created to address current needs and goals in the EIU strategic plan. EIU’s campus spans 320 acres and includes 88 buildings, totaling approximately 3.5 million gross square feet. The average building age is 56 years, with the oldest being Old Main (the Livingston C. Lord Administration Building), built in 1899, and the newest being the Renewable Energy Center, built in 2011. The Integrated Science building, currently in the planning phase, is anticipated to open in 2028. Many of the facilities were constructed during the post-war college boom of the 1960s and 1970s. As the campus continues to age, it is imperative to assess how we can remain responsible stewards of our facilities and resources to support the needs of our students and employees.

The Keep (Eastern Illinois University)
Openalex Percentile: Top 54%
Superconducting and THz Device Technology
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.