Final Design Review: Corrective Maintenance and 5S Program For: Great South Metals, Acworth, Georgia

Great South Metals (GSM) of Acworth, Georgia provides steel slitting services to a variety of customers. In July 2024, ISYE 4902 Group 2 (Group2) began a consulting relationship with GSM with the intended purpose of process improvement and corrective maintenance. Three major objectives are defined for this Fall 2024 project: perform corrective maintenance on 60” slitter line banding table; provide a solution for crane load monitoring; develop a 5S methodology for GSM’s facility. Group 2 employed root causes analysis to identify and correct mechanical issues related to the slitter line banding table. Expected average banding table process-time dropped from 3 minutes to 2 minutes 15 seconds. Group 2 researched crane hoist electronics in order to find a retrofit solution for crane load monitoring. Monitoring equipment provides GSM with the ability to predict component failures and minimize crane downtime. Group 2 worked with GSM to develop a comprehensive 5S plan for the Acworth slitting facility. Group 2 provided recommendations with particular focus on cleanliness, safety, and ergonomics.

Publication Details

Journal
DigitalCommons - Kennesaw State University (Kennesaw State University)
Published
2024-12-02
Primary Topic
Libraries and Information Services
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Final Design Review: Corrective Maintenance and 5S Program For: Great South Metals, Acworth, Georgia

DigitalCommons - Kennesaw State University (Kennesaw State University)
Libraries and Information Services
article

Final Design Review: Corrective Maintenance and 5S Program For: Great South Metals, Acworth, Georgia

article en

Abstract

Great South Metals (GSM) of Acworth, Georgia provides steel slitting services to a variety of customers. In July 2024, ISYE 4902 Group 2 (Group2) began a consulting relationship with GSM with the intended purpose of process improvement and corrective maintenance. Three major objectives are defined for this Fall 2024 project: perform corrective maintenance on 60” slitter line banding table; provide a solution for crane load monitoring; develop a 5S methodology for GSM’s facility. Group 2 employed root causes analysis to identify and correct mechanical issues related to the slitter line banding table. Expected average banding table process-time dropped from 3 minutes to 2 minutes 15 seconds. Group 2 researched crane hoist electronics in order to find a retrofit solution for crane load monitoring. Monitoring equipment provides GSM with the ability to predict component failures and minimize crane downtime. Group 2 worked with GSM to develop a comprehensive 5S plan for the Acworth slitting facility. Group 2 provided recommendations with particular focus on cleanliness, safety, and ergonomics.

DigitalCommons - Kennesaw State University (Kennesaw State University)
Industry, innovation and infrastructure
Openalex Percentile: Top 17%
Libraries and Information Services
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Final Design Review: Corrective Maintenance and 5S Program For: Great South Metals, Acworth, Georgia · DigitalCommons - Kennesaw State University (Kennesaw State University) (2024) | TGRS Research Map | TGRS