A Dyer Story: US 30 Bridge Replacement
Discover how a utility company, contractor, designer, and utility coordinator collaborated to safely and successfully execute a bridge replacement project right next to a gas pipeline. This session will provide an in-depth look at the challenges faced, the strategies employed, and the teamwork that made it all possible. Don’t miss this opportunity to learn from a project that utilized available resources to mitigate risks and achieve a successful bridge replacement.
Publication Details
- Journal
- Purdue e-Pubs (Purdue University System)
- Published
- 2025-03-19
- Primary Topic
- Linguistic research and analysis
- Type
- article
- Field-Weighted Citation Impact
- 0.00