FROM THE TIGRIS TO THE BANKS OF THE EUPHRATES: POST-FLOODING ASSESSMENT AT THE TISHREEN DAM RESERVOIR , NORTH SYRIA

The paper presents the application of a reproducible tool, already tested by the authors on Lake Mosul, for the post-flooding assessment of the heritage sites impacted by the construction of dam reservoirs. This study examines the Tishreen Dam Reservoir (Syria) on the Middle Euphrates as a case study. The dam’s construction lasted from 1991 to 1999, resulting in a 60 km long artificial lake. Salvage surveys and excavations were carried out during the construction period, shedding light on the richness of the region’s cultural heritage. This area has gained attention in recent years due to an unprecedented drought that revealed several archaeological sites and villages that were believed to be lost for good. Based on the results of a new set of cost-efficient tools for observing the ‘emersion patterns’ of archaeological sites, we present an overview of the dam construction impact and an assessment of damage timescales and extent at the various sites involved.

Publication Details

Journal
Nova Science Publishers (Nova Science Publishers, Inc.)
Published
2024-12-01
Primary Topic
Galaxies: Formation, Evolution, Phenomena
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

FROM THE TIGRIS TO THE BANKS OF THE EUPHRATES: POST-FLOODING ASSESSMENT AT THE TISHREEN DAM RESERVOIR , NORTH SYRIA

Nova Science Publishers (Nova Science Publishers, Inc.)
Galaxies: Formation, Evolution, Phenomena
article

FROM THE TIGRIS TO THE BANKS OF THE EUPHRATES: POST-FLOODING ASSESSMENT AT THE TISHREEN DAM RESERVOIR , NORTH SYRIA

article en

Abstract

The paper presents the application of a reproducible tool, already tested by the authors on Lake Mosul, for the post-flooding assessment of the heritage sites impacted by the construction of dam reservoirs. This study examines the Tishreen Dam Reservoir (Syria) on the Middle Euphrates as a case study. The dam’s construction lasted from 1991 to 1999, resulting in a 60 km long artificial lake. Salvage surveys and excavations were carried out during the construction period, shedding light on the richness of the region’s cultural heritage. This area has gained attention in recent years due to an unprecedented drought that revealed several archaeological sites and villages that were believed to be lost for good. Based on the results of a new set of cost-efficient tools for observing the ‘emersion patterns’ of archaeological sites, we present an overview of the dam construction impact and an assessment of damage timescales and extent at the various sites involved.

Nova Science Publishers (Nova Science Publishers, Inc.)
Climate action
Openalex Percentile: Top 56%
Galaxies: Formation, Evolution, Phenomena
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.