Analysis of the risk of TBM jamming through a challenging geological section at the Brenner Base Tunnel

The mechanized excavation of deep tunnels in low-quality rock-masses often leads to high pressures on the shield, potentially causing TBM jamming. This study analyses the excavation behaviour of a double-shield TBM in a challenging geological section of the Brenner Base Tunnel at significant depth. To investigate the interaction between the rock-mass and the shield, finite element axisymmetric analyses were performed. These analyses were calibrated against monitoring data collected during tunnelling, specifically, shield gap measurements taken by fontimeters and records of gripper extensions. Additionally, a sensitivity analysis was conducted to evaluate the effect of variations in shield length and rock-mass conditions. The results show that the thrust force exerted by the hydraulic jacks in the encountered conditions would have been sufficient to overcome the frictional resistance imposed by the rock-mass pressure on the shield. However, even slight reductions in rock-mass quality or increases in shield length would be linked to a significant rise in thrust demand and a greater likelihood of TBM jamming.

Publication Details

Journal
IRIS Research product catalog (Sapienza University of Rome)
Published
2025-01-01
Primary Topic
Tunneling and Rock Mechanics
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Analysis of the risk of TBM jamming through a challenging geological section at the Brenner Base Tunnel

IRIS Research product catalog (Sapienza University of Rome)
Tunneling and Rock Mechanics
article

Analysis of the risk of TBM jamming through a challenging geological section at the Brenner Base Tunnel

article en

Abstract

The mechanized excavation of deep tunnels in low-quality rock-masses often leads to high pressures on the shield, potentially causing TBM jamming. This study analyses the excavation behaviour of a double-shield TBM in a challenging geological section of the Brenner Base Tunnel at significant depth. To investigate the interaction between the rock-mass and the shield, finite element axisymmetric analyses were performed. These analyses were calibrated against monitoring data collected during tunnelling, specifically, shield gap measurements taken by fontimeters and records of gripper extensions. Additionally, a sensitivity analysis was conducted to evaluate the effect of variations in shield length and rock-mass conditions. The results show that the thrust force exerted by the hydraulic jacks in the encountered conditions would have been sufficient to overcome the frictional resistance imposed by the rock-mass pressure on the shield. However, even slight reductions in rock-mass quality or increases in shield length would be linked to a significant rise in thrust demand and a greater likelihood of TBM jamming.

IRIS Research product catalog (Sapienza University of Rome)
Openalex Percentile: Top 52%
Tunneling and Rock Mechanics
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Analysis of the risk of TBM jamming through a challenging geological section at the Brenner Base Tunnel · IRIS Research product catalog (Sapienza University of Rome) (2025) | TGRS Research Map | TGRS